NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Air monitoring contract scope, DEP

Machine-extracted title · confidence 45%

Contract scope of work for air monitoring and analysis services under DEP asbestos control program.

NYC-WTC_000363049–000363052
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

z Z ■<

o o co

I io NEW YORK CITY DEPARTMENT OF ENVIRONMENTAL PROTECTION ■D c o ASBESTOS CONTROL PROGRAM CT o o' o o AIR MONITORING AND ANALYSIS ■D (33 o BID SHEET O 3. o cn K) ESTIMATED COST 03

o o o c 3 The cost of each item must include the preparation, quality assurance and control, clean-up, storage of samples etc., normally CD O associated with the sampling, visual inspection and analysis and producing the reports requested.

Item Description of Item Turnaround Time Unit Price Estimated Quantity Cost No (hours) 1 Air Monitoring Technician(Conduct Air nTa $ 35.00 /hour 5120 hours S 179,200 Sampling)

2 TEM Sample Analysis by AHERA Method 24 hours S 45 /sample 2000 samples S 90,000

3 Air Monitoring Technician(Conduct visual N/A S 225.00 /inspection 400 visual inspections $ 90,000 clearance inspection)

(PROJECT 1 )

BID TOTAL PROJECT 1 = Sum of Cost, Item 1-3 $ 359.200

Item Description of Item Turnaround Time Unit Price Estimated Quantity Cost No (hours) 1 Air Monitoring Technician(Conduct Air N/A S 35.00 /hour 4000 hours $ 140,000 Sampling) o 2 TEM Sample Analysis by AHERA Method 24 hours $ 45 /sample 200 samples $ 9,000 H

3 PCM Sample Analysis by NIOSH 7400 24 hours $ 20 /sample 2000 SAMPLES S 40,000

Io METHOD

(PROJECT 2) o Io o co BID TOTAL PROJECT 2 = Sum of Cost, Item 1-3 $ 189,000 co CT

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363052Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000141438 · Box DEP Box 05

Contract scope defining regulatory compliance and bidding requirements for air monitoring services at the World Trade Center site.

Similar indexed content

NYC-WTC_000362773

Contract scope of work for asbestos air monitoring and analysis services with NYC DEP.

Similar indexed content

Compare copies and versions →