z z
■<
o NEW YORK CITY o
i
1^
DEPARTMENT OF ENVIRONMENTAL PROTECTION
ASBESTOS CONTROL PROGRAM
co
■D
o c
o AIR MONITORING AND ANALYSIS CT
o o'
cn BID SHEET
o ■D
o
CD
ro
ESTIMATED COST 3.
co 03
o
o
oc
The cost of each item must include the preparation, quality assurance and control, clean-up, storage of samples etc., normally 3
CD
associated with the sampling, visual inspection and analysis and producing the reports requested.
Item Description of Item Turnaround Time Unit Price Estimated Quantity Cost
No (hours)
1 Air Monitoring Technician(Conduct Air N/A $ 35..00 /hour 5120 hours $ 179,200
Sampling)
2 TEM Sample Analysis by AHERA Method 24 hours $ 45 /sample 2000 samples $90,000
3 Air Monitoring Technician(Conduct visual N/A $ 225*00 /inspection 400 visual inspections $ 90,000
clearance inspection)
(PROJECT 1 )
BID TOTAL PROJECT 1 = Sum of Cost, Item 1-3 $ 359,200
Item Description of Item Turnaround Time Unit Price Estimated Quantity Cost
No (hours)
1 Air Monitoring Technician(Conduct Air N/A $ 35.00 /hour 4000 hours $ 140,000
Sampling)
2 TEM Sample Analysis by AHERA Method 24 hours $ 45 /sample 200 samples $9,000
3 PCM Sample Analysis by NIOSH 7400 24 hours $ 20 /sample 2000 SAMPLES $40,000
METHOD
(PROJECT 2)
BID TOTAL PROJECT 2 = Sum of Cost, Item 1-3 $ 189,000
OCR can misread numbers and units. Confirm readings against the page image before using them.