BID SHEET
ESTIMATED COST
The cost of each item must include the preparation, quality assurance and control, clean-up, storage of samples etc., normally
associated with the sampling, visual inspection and analysis and producing the reports requested.
Item Description of Item Turnaround Time Unit Price Estimated Quantity Cost
No (hours)
1 Air Monitoring Technician(Conduct Air N/A $ 35.00 /hour 5120 hours $ 179,200
Sampling)
2 TEM Sample Analysis by AHERA Method 24 hours $ 45 /sample 2000 samples $ 90,000
3 Air Monitoring Technician(Conduct visual N/A $ 225.00 /inspection 400 visual inspections $90,000
clearance inspection)
(PROJECT 1 )
BID TOTAL PROJECT 1 = Sum of Cost, Item 1-3 $ 359,200
Item Description of Item Turnaround Time Unit Price Estimated Quantity Cost
No (hours)
1 Air Monitoring Technician(Conduct Air N/A $ 35.00 /hour 4000 hours $ 140,000
Sampling)
2 TEM Sample Analysis by AHERA Method 24 hours $ 45 /sample 200 samples $ 9,000
3 PCM Sample Analysis by NIOSH 7400 24 hours $ 20 /sample 2000 SAMPLES $40,000
METHOD
(PROJECT 2)
BID TOTAL PROJECT 2 = Sum of Cost, Item 1-3 $ 189,000