WTC cleanup program roles and responsibilities

Machine-extracted title · confidence 40%

USEPA/DEP roles for the WTC cleanup program and safety oversight.

NYC-WTC_000363028–000363041
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work B

Application: A visual inspection was performed and the presence of accumulations of debris (including large or significant amounts of dust) from the collapse of the WTC was identified by EPA or designee.

In some unique circumstances. Scope B may be applied on a limited basis within a unit as determined necessary by the Monitoring Contractor in consultation with EPA. Residents may be present depending on these unit specific circumstances. In cases where clean up areas can be isolated by closing doors or by the erection of containment barriers, the resident may be present in the unit. In all other applications of Scope B it is assumed that residents will not be presen

1. A site specific work plan will be prepared for review and approval by I of work. This work plan will include detailed procedi *es for the removal ebris and the cleaning. rillk 2. An ACP-7 form asbestos project notification form shall be su , as required by Title 15, Chapter 1 of the RCNY, directly to the DEP Asbestoi Program prior to the start of work. NYS DOL notification shall be submi^e u

3. At least one asbestos supervisor shall be present a 'fk pl; |iy(work place is defined in Title 15, Chapter 1 RCNY as the work area and fl ition enclosure system).

4. Personal protective equipment including disposable cl hing, gloves, and respirators shall be worn during this clean-up activity in accordance witt 'SHA rules and regulations. Illi ..jiiF 5. Warning signs shall be posted at the iroach to the work area.

6. A work© untaminati ISure system shall be installed at the entrance to the work area. A remote mtaminati •sure system shall be considered when appropriate i.e. inability to comp] is compliances HI irovisioi due to space limitation or other agency rules, such as for SP egr* s requirements.

7. VAC" systems shall ut down and locked out or isolated locally. The site specific work an shall provide (al information on the HVAC system and proposed procedures for lutdown or isolatio:

8. I lolation barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed 8g/

9 Negative pressure ventilation equipment shall be installed and operated during all clean-up activities. Equipment shall run continuously until clearance air monitoring. A minimum of one air change every 30 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with the primary unit capacity may be connected in series.

CITY_2IMCl00_000439053 NYC-WTC_000363039

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363039Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000363004

Continuation of draft scope for indoor cleanup and sampling.

Similar indexed content

Compare copies and versions →