NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 11 pages

Site inspections and dust sampling (Draft 7/2/02)

Machine-extracted title · confidence 37%

Site inspections, surveys, and coordination for dust/debris cleanup.

NYC-WTC_000363017–000363027
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The Project Monitor shall also maintain a copy of each deliverable and all filed documentation submitted under this contract for 365 days.

The Project Monitor shall direct and coordinate all services and report all findings to EPA. The scope of this project will be as follows:

5. The Project Monitor shall be responsible for accessing a secure | Website (url, user name and password to be provided by EPA) to obtain requestor infi ation (address, building identification numbers, etc.). In coordination with the EPA, the »ject Monitor will access residential services requested from the Website and schedule clean- X,es and air .... ...■xsssasiE

sampling with the tenants/owners, asbestos aB ;ment contractors and air noniionng technicians for the various apartments. The Pri ict Monitor will then sup y relevant information on activities for the EPA Indoor Air (ft the secure EPA website. Data to be input may include but is not limited to start an pletion dates for the cleaning, sampling dates and sample identification numbers.

Deliverable •III

The Project Monitor shall review all deliverables pri submission to EPA. The review shall assure that each deliverable is accurate and coi I, technically sound, and free of clerical errors. .Hi:"

liiW The Project monitor shi provide a validated address and scheduling information into the EPA Jndoor Air ueb d; itabase via rz •eed upon alternative electronic format or website approved 'A within 24 'bf activity.

■Ollllfc. fslsBiwiiBiBBi..

6. The I’roject M^ will schedule and conduct pre-cleaning or pre-sampling building inspections of tl iential units, heating, ventilation and air conditioning systems (HVAC) and common space based on the information and requests from the residents and building owners. Residents will be provided with information regarding sampling options (aggressive and modified aggressive sampling protocols) and the handling of valuable personal items (money, jewelry, heirlooms, etc.) And fragile objects during work. The Project Monitor will obtain written access and authorization to access the building and clean the apartments, H\'.-\f’ systems and common spaces using the EPA Access Agreement (to be provided). The Project Monitor will advise EPA if any of following conditions are observed: mixed residential and commercial use within a hmilding; dust and/or debris in common spaces; the presence of mold that may pose a hazard to residents or workers (guidelines to be provided); residents with special needs; potential asbestos-type insulation (e.g., fibrous materials); or other circumstances that may require deviation from the procedures specified in Scope of Work. In consultation with EPA, the Project Monitor will make a determination of the appropriate Cleaning Contract Scope of Work (i.e. Scope A or B) to be implemented. This

CITY_21MC100_000439033 NYC-WTC_000363019

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363019Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000140537 · Box DEP Box 05

Draft scope of work document detailing compliance requirements and procedures for residential cleaning and air sampling south of Canal Street.

Similar indexed content

Compare copies and versions →