Dust Cleaning, Draft 7/10/02, continued

Machine-extracted title · confidence 39%

Continuation of draft scope for indoor cleanup and sampling.

NYC-WTC_000363004–000363016
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

dedicated to that unit will be evaluated. Why is there a distinction being made between those cases where cleaning is requested for an individual residential unit and for a whole building. When only a fraction of the building’s HA^AC system is cleaned, it would seem likely that the uncleaned (contaminated) section of the building’s HVAC system would quickly contaminate the other previously cleaned section. (If this were not the case, it implies that contaminants once in the HVAC system do not migrate, hence there is no problem with any part of the system and v/e shouldn’t bother to clean i ;.) No residential or common spacc shall be cleaned until the HVAC system has been evaluated and cleaned as necessary'.

The Monitoring contractor shall inspect HVAC systems or portior bereot cleaned to veri, cleanliness. ■HMBk JI gig

HVAC assessments, cleaning, and cleanliness inspections shall be condi cordance with the National Air Duct Cleaners Association General Spei in for the Cleaning of Commercial Heating, Ventilating and Air Cor ining Systems and the NADCA Assessment, Cleaning and Restoration Standard (ACR Qualified personnel shall perform the HVAC evaluation and cleanliness inspectiol inimum such personnel shall have an understanding of HVAC systi lign and e in utilizing accepted indoor environmental sampling practice'^, cu gustry H’ feaning procedures, and applicable industry standards. M ■Hi

Deliverables

The Project Monitor shall r w all verables !or to submission to EPA. The review shall assure that each deliverable is acc'.irate and complete, technically sound, and free of clerical en or. The contractor should document findings and report the results of the initial evaluation and the evaluation after the clean up. 1 The Project Monitor ;cord if the HVAC systems have been evaluated and cleaned subseq itember , 2001. If yes, when and by whom. This information shall be providi viaF ■ or an as eed upon alternative electronic format or website approved by EPA within 2^ liflctivify-

|i W

10. In the event4 I mold is observed in a residence during the pre-cleaning inspection, the Monitoring Contractor will contact the NYCDOH and EPA. Is any amount of mold sufficient to trigger this contact? Will cl<;an up procede irregardless of finding mold? (And w hat will NYCDOH and EPA do about it?)

Deliverables

The Project Monitor shall record if mold is present and notify the NYCDOH and EPA. This information shall be provided via EPA Indoor Air web database or an agreed upon alternative

CITY_2IMCl00_000439029 NYC-WTC_000363015

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363015Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →