NYC 9/11 Public Portal Document
to allow access to internal portions of the air conditioner. The internal portions of the
air conditioner and housing will then be vacuumed. Filters will be vacuumed and
reinstalled. Air conditioners will be reassembled and reinstalled after cleaning.
j- Paperwork and books will be HEPA vacuumed.
k. Electri cal outlets will be vacuumed.
1. Appliances such as refrigerators and stoves will be cleaned and moved. The floor
footprint of the appliances will be cleaned and the appliance will be reinstalled in their
original positions.
m. Refrigerator cooling tubes will be brushed and vacuumed.
n. Stove storage drawers, will be vacuumed if p)resent. Stox e coo will be opened
and vacuumed. Stove exhaust fan filters wiljbe cleaned.
o. The first foot of all exhaust duct work (includirig stove, dryer am vents) will
be vacuumed. Exhaust fans will be vacuumedUnd wiped.
P- Closet floors will be vacuumed.
q- Solid objects (electrical equipment, exercise ;nt, etc.) will be wet wiped,
moved to allow cleaning of the underlying surfi dl be returned to their original
location.
r. Dishwasher toe plates will be reniovj the flooM le appliance will be
cleaned. ■
s. Baseboard heaters will be de: I. PlotCClij ; co\ ers on finned radiant heaters and
baseboard heaters will be rei to e.xpose eat elemenis. Fins are to be brushed and
vacuumed to remove dust.
t. All cleaning equipment wi' I be vs,euumed and/or wet wiped after completion of the
cleaning and before l emovr il ffoin the work area.
J hL
9. HEP A air filtration di (AFDs) antinuously during all cleaning activities, as
apP2 jven s^ Ips. One 200 cubic feet per minute (CFM) device shall
beia Kr 36,< ; feet.
10. A minimum of on asbesto: ir shall be present in each building during work.
11. A Cleaning CiecIC devdoped by EPA) will be completed by the cleaning contractor
as tasks are compl ment the progress of the cleaning.
12. ■ Tie cleaning contractor shall notify the monitoring contractor immediately upon completion
if the cleaning. The Monitoring Contractor will conduct a thorough visual inspection to verify
....i
^e absence of visible dust accumulations . If dust is observed the cleaning contractor will
UH eclean as necessary at no additional cost.
■III
13 Air sampling shall be performed by the Monitoring Contractor after the area is free of dust
accumulations as determined by the Monitoring Contractor.
14. Any damage or loss that occurs during cleaning is the responsibility of the cleaning contractor.
5
CITY_21MC100_002847580
NYC-WTC_000362944
OCR can misread numbers and units. Confirm readings against the page image before using them.