NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 10 pages

World Trade Center Dust Cleaning, Draft 8/2002

Machine-extracted title · confidence 46%

Draft permit application for WTC dust cleaning; direct assistance options.

NYC-WTC_000362921–000362930
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

cleaning contractor will reclean as necessary at no additional cost.

19. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust accumulations as determined by the PJonitoring Contractor. The residence will be recleaned and retested if the clean-up criteria of 0.0009 fibers/cc (PCME measured by TEM) is not achieved or if determined necessary by EPA. This clean-up criterion may be reevaluated and revised, if deteraiined necessary based on field conditions and analytical limitations.

20. After successful clearance air monitoring, isolation barriers shall be removed in conjunction v/ith the use of a HEPA vacuum.

21. Any damage or loss that occurs during cleaning is the responsibility of the cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts of third parties not involved in the cleaning.

22. All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the RCNY and New York Industrial Code Rule 56.

23. If mold or peeling, flaking or chalking paint is observed, the cleaning contractor shall immediately contact the Monitoring Contractor.

24. If in-place materials suspected to contain asbestos are observed the Cleaning Contractor shall immediately notify the Monitoring Contractor. The Monitoring Contractor will evaluate the condition of the material to identify damaged, deterioration, delamination, etc. The Cleaning; Contractor shall wrap suspect ACM that is in good or excellent condition with 6-mil polyethylene sheeting and seal airtight with duct tape or equivalent method prior to cleaning or air monitoring.

25. In the event that damaged, deteriorated, delaminated, etc. suspected ACM is observed, the Cleaning Contractor will notify the Monitoring Contractor. Cleaning or air monitoring will not proceed in areas where such suspected ACM is observed until instructed otherwise.

10

CITY_21MC100_002847575

NYC-WTC_000362930

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362930Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000362960

Project quadrant for indoor dust cleaning; program overview and options.

Similar indexed content

Compare copies and versions →