Draft Scope of Work for WTC Dust Cleaning, July 2002

Machine-extracted title · confidence 98%

Draft contract scope outlining compliance requirements and a direct assistance program for residents south of Canal Street.

NYC-WTC_000140443–000140452

Folder label: “SCOPES OF WORK IN DOOR AIR & CLEANING

Page image
Scanned page image, NYC-WTC_000140452
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

completion of the cleaning. The Monitoring Contractor will conduct a thorough visual inspection to verify the absence of visible dust accumulations. If dust is observed, the cleaning contractor will reclean as necessary at no additional cost.

19. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust accumulations as determined by the Monitoring Contractor. The residence will be recleaned and retested if the clean-up criteria of 0.0009 fibers/cc (PCME measured by TEM) is not achieved or if determined necessary by EPA. This clean-up criterion may be reevaluated and revised, if determined necessary based on field conditions and analytical limitations.

20. After successful clearance air monitoring, isolation barriers shall be removed in conjunction with the use of a HEPA vacuum.

21. Any damage or loss that occurs during cleaning is the responsibility of the cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts of third parties not involved in the cleaning.

22. All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the RCNY and New York Industrial Code Rule 56.

23. If mold or peeling, flaking or chalking paint is observed, the cleaning contractor shall immediately contact the Monitoring Contractor.

24. If in-place materials suspected to contain asbestos are observed the Cleaning Contractor shall immediately notify the Monitoring Contractor. The Monitoring Contractor will evaluate the condition of the material to identify damaged, deterioration, delamination, etc. The Cleaning Contractor shall wrap suspect ACM that is in good or excellent condition with 6-mil polyethylene sheeting and seal airtight with duct tape or equivalent method prior to cleaning or air monitoring.

25. In the event that damaged, deteriorated, delaminated, etc. suspected ACM is observed, the Cleaning Contractor will notify the Monitoring Contractor. Cleaning or air monitoring will not proceed in areas where such suspected ACM is observed until instructed otherwise.

10

NYC-WTC_000140452

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000140452Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140281 · Box DEP Box 05

Draft contract scope defining regulations and procedures for asbestos cleanup and air sampling assistance programs in Lower Manhattan.

Filed in the same folder

Compare copies and versions →