NYC-WTC_000407465
Pre-bid conference notice and background for asbestos abatement at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗Chain-of-custody documenting pre-bid and monitoring requirements for WTC-LBA project.
NYC-WTC_000362715–000362720OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DRIFT»4. Sampling equipment shall be placed at representative locations and away from obstruction. Sampling cassette must be placed on a tripod and not taped to existing surfaces. All air sampling equipment shall be pre- and post- calibrated to insure accurate air sampling volumes.
5. The Air Sampling Technician shall perform clearance air sampling after the areas are free of dust accumulations as determined by the Project Monitor. All surfaces must be completely dry prior to the start of sampling. Clearance air sampling shall be performed at each apartment. Five samples shall be collected in each apartment and two samples shall be collected at the first floor lobby. The elevator shaft shall be cleared separately. Clearance air monitoring shall be performed after the completion of all clean up activities at the work site. Clearance air sampling shall be aggressive and performed in accordance with Title 15, Chapter 1 of the RCNY Section 1-43 (a)-(d).
6. Clearance air samples shall be collected in accordance with the procedures specified in the NIOSH 7400 Method. The flow rate for collection of air samples shall be at least 10 liters per minute and no more than 15 liters per minute. Air sampling cassettes must be monitored to ensure the filters do not develop dark spots that would indicate clogging. The minimum sampling volume is 3600 liters. If clogging develops, the cassette must be changed.
7. All clearance air samples and completed chain of custody forms must be transported to the laboratory immediately after sampling is completed.
Clearance Criteria
1. The following clearance levels have been established by the USEPA for clean up activities resulting from the collapse of the WTC.
Table 2: Clearance Criteria Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 pg/tr Primary clearance level Dioxin in settled dust <4ng/nr Primary clearance level Fibrous glass in air <0.01 f/cc Secondary clearance level Crystalline silica in air Secondary clearance level PAHs in settled dust <0.3 mg/nr Primary clearance level
Cleaning shall not be considered complete unless the primary clearance levels are achieved (see Table 2). The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, however failure to meet the secondary clearance levels does not automatically trigger the re-cleaning. In the event re-cleaning is required, re-sampling shall be performed immediately upon completion of the cleaning.
Project Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor 5 of 6
CITY_DEP_WORBY_CANNATA_SUBP_000020418
NYC-WTC_000362719
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000407465
Pre-bid conference notice and background for asbestos abatement at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362684
Document detailing scope of asbestos-related air monitoring and site personnel requirements.
13 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407471
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362696
Chain-of-custody document detailing asbestos abatement scope and on-site monitoring plan for 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209413
Statement of work describing requirements for environmental sampling and air monitoring during interior cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407459
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407447
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362709
Chain-of-custody describing scope of asbestos monitoring and interior cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407453
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284079
Mandatory pre-bid and monitoring scope for asbestos abatement and air monitoring at 125 Cedar Street.
12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362534
Draft DEP scope detailing on-site air monitoring and clearance sampling for asbestos abatement at 114 Liberty Street.
13 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000195796
Document outlining requirements for a pre-bid conference regarding asbestos abatement and air monitoring at a World Trade Center facility.
12 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000162860
Revised scopes of work documents for 114 Liberty Street project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407465
Pre-bid conference notice and background for asbestos abatement at 114 Liberty Street.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155635
Submission of contract changes to scope documents awaiting final approval and bidder lists.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234342
Contract excerpt outlining compliance requirements and qualifications for monitors and technicians involved in WTC debris cleanup.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234543
Contract document establishing compliance requirements and qualifications for monitors conducting debris cleanup and air sampling near the World Trade Center site.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000234300
Contract document outlining requirements for project monitors and air sampling technicians for the WTC debris cleanup and air monitoring.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000407465
Pre-bid conference notice and background for asbestos abatement at 114 Liberty Street.
Similar indexed content
NYC-WTC_000362684
Document detailing scope of asbestos-related air monitoring and site personnel requirements.
Similar indexed content
NYC-WTC_000407471
Scope of work and monitoring plan for asbestos cleaning at 114 Liberty Street.
Similar indexed content
NYC-WTC_000362696
Chain-of-custody document detailing asbestos abatement scope and on-site monitoring plan for 114 Liberty Street.
Similar indexed content
NYC-WTC_000209413
Statement of work describing requirements for environmental sampling and air monitoring during interior cleaning at 114 Liberty Street.
Similar indexed content