Day final daily work force report, World Trade Center, Dec

Machine-extracted title · confidence 28%

Day final daily workforce and equipment at World Trade Center site, Dec 4, 2001.

NYC-WTC_000361551
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1

GRACE CONTRACTING CORP. 161-45 6th Road, Whitestone. N.Y. t 1357-(713) 787-9000 DATE; DECEMBER 4, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT I ___________________ i___________________ Job Name & Location: World Trade Center Contract No. Weather Conditions ; ===================;=============== Equipment CLASSIFICATION QUANT. Description MANNED STANDBY OLE SUPERINTENDENT : 2 CAT 966 LOADER 1 PROJECTENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER ( CAT 973 LOADER ~ 1 FOREMEN ! 1 CAT 365 GRAPPLER ~ t SAFETY OFFICER , 1 CAT 375 GRAPPLER ~ ~~ 1 LABORERS 21 HITACHI 750 GRAPPLER 1 ■

IRONWORKERS ____________ 1 HITACHI 550 GRAPPLER ~ 1- LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 235 hammer HOE ram 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF ~ 1 DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES: OZONE PARK LUMBER HIGH DECK TRAILERS 3 AWISCO BATTERIES WELDING TRUCK 1 ■ FUELTRUCK 1 ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 13 ' SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ‘ CARGO BOXES 3 ■ FLAT TRUCK 1 LIGHT TOWERS USED FOR 2.5 HOURS ’ PUMP 2 ' ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work: LOADS OUT: 67 [LOAD OUT STEEL AND DEBRIS ____________ MANNED TARPING AND TRIMMING STATIONS t MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'SROADWAY (CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 YUKE LOADS 76 GRACE CONTRACTING PO Approved By: Title:_______ For: SUPERINTENDENT

DAILY WORK FORCE REPORT 12040.xls

02.200091 CITY_21MC100_002352228

NYC-WTC_000361551

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361551Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →