Day shift daily work force report, World Trade Center, Dec

Machine-extracted title · confidence 28%

Day shift daily workforce and equipment at World Trade Center site, Dec 5, 2001.

NYC-WTC_000361549
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^CFiACE CONTRACTING CORP. 6th Road Whitestone. N.Y. 11367- (748) 767-9000 DATE; DECEMBER 5, 2001 (DAY ) _____________________ s=saBsa===s==ss===s=s=s===s=s=======s==:=sssz=zs:=ss=:= FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE ^SUPERINTENDENT ; 1 CAT 966 LOADER J— PROJECT ENGINEER 2 CAT 446 BACKHOE 1 . OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 |CAT 365 GRAPPLER______ 1 SAFETY OFFICER 1 CAT 375-GRAPPLER 1 LABORERS . 24 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER ILIVERIES: AWISCO HIGH DECK TRAILERS 3 ABCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 LIGHT TOWERS USED FOR 2.5 HOURS FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKERIGENIE LIFT 1

Description of Work: ________________________________________________________________________________ DELAYS: 2:30-4:00 PM ALL WORK STOPPED LOAD OUT STEEL AND DEBRIS ■________ _______________________________________________________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________________________ _________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 ' l.CAOSOUT 53 YUKE LOADS 35 GRACE CONTRACTING CORP _ I Approved By. BY: superintendent

DAILY WORK FORCE REPORT 1205D.xls Q2.200089

CITY_21MC100_002352226

NYC-WTC_000361549

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361549Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →