NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Day shift daily work force report, World Trade Center, Dec

Machine-extracted title · confidence 28%

Day shift daily workforce and equipment at World Trade Center site, Dec 7, 2001.

NYC-WTC_000361546
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I I J

^^RACE) CONTRACTING CORP. sth Roa^. WWlBstono, NT. 11357.(718) 767-9000 DATE; DECEMBER 7. 2001 (DAY FINAL)

DAILY WORK FORCE REPORT

, 1 Job Name & Location: World Trade Center Contract Nd. Weather Cqnditions i

Labor II Equipment CLASSIFICATION QUANT. |[________ Description MANNED STANDBY IDLE SUPERINTENDENT , 2 hCAT 966 LOADER" 1 PROJECT Engineer i 2 CAT 446 BACKHOE 1 OFFICE ENGINEER : CAT 973 LOADER 1 FOREMEN j i CAT 365 GRAPPLER 1 SAFETY oF.FICER “ 1 CAT 375 GRAPPLER 1. LABORERS' 19 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 I ■ 4 HITACHr550 GRAPPLER 1 LOCAL 15 ; 8 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOF^ 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 2 MECHANIC? 2 TOOL TRUCK 1 HOUSE WRECKERS 6 TOOL VAN 1 ROLLOFF___________ , DUMP TRAILERS ’ 7 LOW BED TRAILER ' lELIVERIE?: AWISCO .________ HIGH DECK TRAILERS ' 2 ' AUSTER RUBBER WELDING TRUCK 1 FUEL TRUCK T 1 PICKUP TRUCKS t 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK iFLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 L FLAT TRUCK ' i1 PUMP ; 2 ROLLER ' 11 RAINMAKER/GENIE LIFT 1

Description {af Work: LOADS OUT: 60 YUKE LOADS 30____________ LOAD OUT'steel AND DEBRIS. MANNED TARPING AND TRIMMING STATIONS MANNED Water stations for dust control MAINTAIN Traffic flow in and out of area~ T CONTINUEREMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TlQ MEET AMEC'S ROADWAY CONTINUEiBURNING OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-S 253 ' ‘ i

GRA^E CONTRACTING^CORP^ Approved By: jitis: : iBY:' Ifot SUPERINTENDENT 1 I 1 DAILY WORK FORCE REPORT 1207D.xls

02.200085

CITY_21MC100_002352222

NYC-WTC_000361546

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361546Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

ATC sampling data, WTC site

NYC-WTC_000429735

Air sampling data with asbestos and dust results from WTC, Jan 2002.

Similar indexed content

Compare copies and versions →