NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Night final daily work force report, World Trade Center

Machine-extracted title · confidence 28%

Night final daily workforce and equipment listing for World Trade Center site, Dec 8, 2001.

NYC-WTC_000361543
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 6th Road, Wh'itestore N.Y. 11357.(718)767-9000 DATE; SATURDAY DECEMBER 8, 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. [ Weather Conditions COLD RAIN ALL NIGHT

Labor Equipment CLASSIFICATIONQUANT. Description MANNED STANDBY IDLE SUPERINTENDENT I 1 CAT 966 LOADER 1 PROJECT ENGINEER: 1 CAT 446 BACKHOE 1 OFFICE ENGINEER :_________________ CAT 973 LOADER 1 FOREMEN ; 2 CAT 365 GRAPPLER 1 SAFETY OFFICER ;___________ • CAT 375 GRAPPLER ■ 1 LABORERS i 21 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14__________ [_________________ 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER_______ _________________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS I TOOL TRUCK HOUSE WRECKERS i 6 TOOL VAN ROLL OFF EXCAVATED SOUTH TOWER DEBRIS TOWARDS WEST DUMP TRAILERS 8 LOADED TULLYS EUKES I LOW BED TRAILER HOERAMMED CONCRETE ON REMAINS OF NORTH WALL HIGH DECK TRAILERS 2 1200 DOWN WHEN SHIFT STARTED - REPAIRED THEN WELDING TRUCK GRAPPLE BROKE - REPLACED WITH 750 FUEL TRUCK 1 RECEIVED NEW GRAPPLE FOR 1200 TONITE PICKUP TRUCKS 1 ■ 235 DAMAGED - FUEL TANK LEAKING AND HYDRAULIC LIGHT TOWERS 13 LEAK FROM UNDERCARRAGE SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 1 FLAT TRUCK [PUMP ~ 2 Iroller ~ 1RAINMAKEFUGENIE LIFT 1 ss Description of Work: [LOADS OUT: 64 LOADED 43 EUKES LOAD OUT STEEL AND DEBRIS MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA___________________________________________________ _ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING.OF THE SW CORNER COLUMN BEAMS ELEVATIONS: ALL MACHINES LEVEL B-5 253 ................... . ' DELAYS: , GRACE tXNTRACTING CORP Approved By: Title; “ BY; j .(4 For: " SUPERINTENDENT

DAILY WORK FORCE REPORT1208N.xls -02 ..200082 CITY_21MC100_002352219

NYC-WTC_000361543

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361543Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →