Daily work force report, WTC site, Dec 6, 2001 (night)

Machine-extracted title · confidence 52%

Night final daily workforce report for World Trade Center site on Dec 6, 2001.

NYC-WTC_000361465
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE; ' DECEMBER 6. 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 [project ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS " 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN ■ 235 HAMMER HOE RAM 1 TEAMSTERS 10 ■ MECHANICS TRUCK 1 . ■ 1 MECHANICS 1 ■ TOOL TRUCK 1 HOUSE WRECKERS 7 'TOOL VAN ■ ROLL OFF ■ DUMP TFtAILERS 7 ■ LOW BED TRAILER ■ HIGH DECK TRAILERS 2 ■ WELDING TRUCK ■ FUEL TRUCK 1 ' PICKUP TRUCKS 2 ■ LIGHT TOWERS 13 ■ SITE MULE 3 ’ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ' OFFICE TRAILERJGENER. 1 ■ CARGO BOXES 3 [ FLAT TRUCK 1 IPUMP 2 ^ROLLER ~ I RAINMAKERJGENIE LIFT 1 ■

Description of Work:___________________________________________________________________________ _ LOADS OUT: 26 DUMP TRAILERS/HIGH BEDS; 33 EUCLIDS LOAD OUT STEEL AND DEBRIS_______________________________________________________________________ _ MAN TARPING AND TRIMMING STATIONS_______________________________________________________________ MAN WATER STATIONS FOR DUST CONTROL_____________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE NORTH WALL COLUMNS____________________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253 __________________________________________________ DELAYS: TOTAL DELAYS OF MACHINES IN HOLE APPROXIMATELY 1 HR FOR FDNY;__________________________ FREON RECOVERY FROM 7-10:30 PM, NO DUMP TRAILERS LOADED. GRACE CONn^TING QORP Approved By: Title: ~ BY: I For: superintendB^t

01.301859 DAILY WORK FORCE REPORT 1206N.xls

__ .W CITY_21MC100_003745260

NYC-WTC_000361465

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361465Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →