Daily work force report, WTC site, Dec 5, 2001

Machine-extracted title · confidence 52%

Day final daily workforce report for World Trade Center site on Dec 5, 2001.

NYC-WTC_000361462
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6lh Road, Whitestone. N.Y, 11357-(718) TST-WXM DATE: DECEMBER 5, 2001 (DAY ) FINAL DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No, Weather Conditions

= Labor ] Equipment CLASSIFICATION QUANT, Description I MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN____________ 1 CAT 365 GRAPPLER 1 IISAFETY OFFICER 1 CAT375GRAPPLER 1 IlLABORERS 24 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 IIlOCAL 14 4 HITACHI 550 GRAPPLER 1 ||lOCAL15 8 HITACH11200 GRAPPLER 1 CARPENTER 1 lies CFM COMPRESSOR ~ 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER DELIVERIES; AWISCO HIGH DECK TRAILERS 3 ABCO [WELDING TRUCK 1 1FUEL TRUCK 1 1 PICKUP TRUCKS 8 1 LIGHT TOWERS 13 ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 ' OFFICE TRAILER/GENER, 1 ■ CARGO BOXES 3 LIGHT TOWERS USED FOR 2.5 HOURS ■ FLAT TRUCK 1 ■ PUMP 2 ■ ROLLER 1 ■ RAINMAKER/GENIE LIFT 1

Description of Work: DELAYS: 2:30-4:00 PM ALL WORK STOPPED LOAD OUT STEEL AND DEBRIS______________________________________________________________________ MANNED TARPING AND TRIMMING STATIONS_________________________________________________________ MANNED WATER STATIONS FOR DUST CONTROL_________;________________ ____________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_____________ __________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS____________ _______________________ __ ELEVATIONS: ALL MACHINES LEVEL B-5 253 —■> iLOADS OUT 53 YUKE LOADS 35 GRACE contracting CORP. / / ~^

Approved By: Tide; For SUPERINTENDENT .

DAILY WORK FORCE REPORT 1205D.xls 01.301631

CITY_21MC100_003745058

NYC-WTC_000361462

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361462Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →