NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, WTC site, Dec 1, 2001

Machine-extracted title · confidence 52%

Daily workforce and equipment report for World Trade Center site on Dec 1, 2001.

NYC-WTC_000361456
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Roa< Whitestone. N.Y. 11357-(716) 767-9000 DATE: DECEMBER 1,2001 (DAY) FINAL DAILY WORK FORCE REPORT

Job Name 8 Loc- Location: _ World Trade Center Contract Na.

Labor ==== = I___________ Equipment CLASSIFICATION UANTIT IfI Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 2 CAT 365 GRAPPLER 1 SAFETY OF =ICER 1 CAT 375 GRAPPLER 1 LABORERS 18 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER ~ 1 CARPENTE 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS_________ 11 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WR ACKERS 7 TOOL VAN 1 ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 lAWISCO OXY/ACET WELDING TRUCK 1 AWISCO TIPS FUEL TRUCK 1 AWISCO OXY/ACET PICKUP TRUCKS 7 LIGHT TOWERS 9 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description c f Work: GATEWAY; 50 DELAYED 7 AM-1:15 PM SEARCH AND RESCUE PORT AUTH P D 365 1-2PM FIRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25____________ CONTINUE TO EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC- MANNED T/HPING AND TRIMMING STATIONS MANNED W^TER STATIONS FOR DUST CONTROL ~ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 EXCAVATING B/W VISTA & TOWER 2 WNTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC ELEVATIONS: 1200-264, 550-274, 375-284, 365-274 LOADS OUT 49 Approved Bi: Title: F^

01.301091

CITY_21MC100_003744595

NYC-WTC_000361456

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361456Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →