Daily work force report, World Trade Center

Machine-extracted title · confidence 41%

Daily workforce and equipment description for World Trade Center site.

NYC-WTC_000360489
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 1' rihRoad. Whitestone, N.Y, 11357-(718) 767-9000 DATE: 2/26/02 DAY FINAL

= sassssBSBaBassssszssaBsasEBnamaaaBaBBBs DAILY WORK FORCE REPORT

ifjob Name & Location: World Trade Center j Contract No. I Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE ,SUPERINTENDENT 1 CAT 966 LOADER FOREMEN 1 CAT 365 GRAPPLER PROJECT ENGINEER 2 CAT 375 GRAPPLER 1 ' SAFETY ENGINEER 1 CAT 375 BUCKET 1 LABORERS___________ 3 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACH11200 GRAPPLER 1" : LOCAL 14____________ 2 185 CFM COMPRESSOR RUNNING UNMANNED ■|LOCAL 15____________ 2 235 HAMMER HOE RAM 1 ■CARPENTER MECHANICS TRUCK 2 i CARPENTER FOREMAN TOOL TRUCK TEAMSTERS (FUEL) 1 TOOL VAN :i^HANICS 2 ROLLOFF 'Rouse wreckers DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK ■DELIVERIES: FUELTRUCK 1 PICKUP TRUCKS 5 ■’NOTE: LIGHT TOWERS RAN 2 HOURS LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK DE LAYS: TRUCK 63, 65, & 70 EACH HAD A DELAY OF ABOUT FLASHING ARROW BOARD 1 45 MINUTES DUE TO WORK ON GPS UNITS OFFICE TRAILER/GENER. 1 _______ T99 DOWN 30 MIN. W/FLAT TIRE_____________ CARGO BOXES 4 -NOTE: HITACH11200 DOWN @ 2:00 PM, FLAT TRUCK 1 USED THE 375 GRAPPLE FROM 2:00 UNTIL 7:00 PM ■ PUMP 2

:^'3 riptiori_ofWorlc________________________ QC:.’PLETED WORK: pY riNUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX________________________________________ JAr TAIN TRAFFIC FLOW INTO AND OUT OF AREA ; ■' riNUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE ,__________________________________________ ■ DELAYED 1730-END OF SHIFT FOR HITACHI COMPUTER RECOVERY (ACCIDENTALLY LOADED INTO TRAILER) AND TIRE CHANGE

GRACE CONTRACTING CORP | )'/ed By: BY:

SUPERINTENDENT

DAILY WORK FORCE REPORT0226D.xls

CITY_21MC100_0 05028952

NYC-WTC_000360489

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360489Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →