Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP.
151-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: 2/12/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center
Contract No.
Weather Conditions
Labor Equipment
CLASSIFICATION QUANT.Description MANNED STANDBY IDLE
SUPERINTENDENT 2 CAT 966 LOADER 1
FOREMEN 1 CAT 365 GRAPPLER 1
jpROJECT ENGINEER 2 CAT 375 BUCKET 1
SAFETY OFFICER 1 CAT 375 GRAPPLER 1
LABORERS___________ 14 HITACHI 750 GRAPPLER 1
IRON WORKERS HITACHI 1200 GRAPPLER 1
LOCAL 14 4 185 CFM COMPRESSOR *SEE NOTE
LOCAL 15 5 235 HAMMER HOE RAM 1
CARPENTER MECHANICS TRUCK 2
IICARPENTER FOREMAN 1 TOOL TRUCK
TEAMSTERS (FUEL) 1 TOOL VAN
MECHANICS 2 ROLL OFF
HOUSE WRECKERS DUMP TRAILERS
LOW BED TRAILER
HIGH DECK TRAILERS
DELIVERIES: WELDING TRUCK 1
FUEL TRUCK 1
PICKUP TRUCKS 6
NOTE: 185 CFM COMPRESSOR RUNNING UNMANNED LIGHT TOWERS 5
SITE MULE 2
14 TEAMSTERS (10 DUMP TRAILERS, 4 EUKES ) DUMP TRUCKS
10 WHEEL DUMP TRUCK
WOTE: TRUCK 63 WAS BEING FILLED WITH DIRT FROM THE FLASHING ARROW BOARD
TRENCH WORK AT LIBERTY & WEST, WILL NOT DO AS OFFICE TRAILER/GENER. 1
MANY LOADS AS THE OTHER TRUCKS CARGO BOXES 4
FLAT TRUCK
DELAYS: TRUCK 99 WAS DOWN FROM 10:00 AM TO 12:00 PM PUMP 2
WITH AIR TANK PROBLEM, & TRUCK 67 WAS DOWN FROM
11:00 TO 12:30 PM WITH NO HEADLIGHTS & A FLAT TIRE
Description of Work:
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTC COMPLEX
MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA
CONTINUE LOGGING TRUCKS AND NUMBER OF LOADS OUT OF SITE
LOADS OUT: 77
GRACE CONTRACTING CORP
Approved By:
Title: Lzi t
For: 'SUPERINTENDENT Z
• C-.S
CITY_21MC100_005028371
NYC-WTC_000360485
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000360485Source: NYC Law Department, mirrored locally