NYC-WTC_000339722
Air monitoring log with TEM/PCM data; site: DDC 30th Street project.
1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗Air monitoring log and chain-of-custody form for project site.
NYC-WTC_000359480–000359481OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
2" to' 0 o 2 KK»eaia45th.Stfee1 WARREN & PANZER ENGINEERS, P. C. PAGE OF / 3 New Yotk. NY 10017 Q Z3 i—h (212J 822^0077_^ AIR MONITORING LOG SHEET/CIIAIN-OF-CUSTODY FORM 0) >ax^2) 822-0630“^ 24 hr+/a 12 hr+/a 6 hr'*’/a 3 h r'^/Q^"'"lmnicdiate‘^7a~'‘^ P.O. Q. C W&P FILE #: &/ o’ co CLIENT: M <</.g ■ i>, & .C________ ___ LABORATORY: Aw ■— CONTACT; Cii£j>- o PROJECT; 'RcAL ANALYSIS METHOD: PCM TEM tTPX ___ 2=_ as Q LOCATION; ST^^ejr-' , circle one 7400 aheraCepa level hASCA job#: Q. TECHNICIAN; CT *< •■.J;r;.- ■’.sample SAMPLE PUMP FLOWRATe total: IcowcENt^ CD § >u PESGRIPTION/LOCATION :'TypE;', ; ■ # :•■
START STOP ; OFF?. ;,(nbAx;J- o 1 c 5. o -JTT S’i.a/c I “+• Ctf8?c^ 6^/ ^/7i, s -i jTo fffs- o 2 -r7 s I € 3^ s- o -t3
-J7 .dftjr 2o6
□lZ t fO-if I 1
r- Cu&Si.! /'fS- 8 Z4izr 0)
O Aii:r CtZggc| ________ /4~i7 (D XJ 0) 5 Zo3i &4z<? 1 \ <D
o{- COMMENTS; SAMPLE BY: Cc^ DATE: fl s>PC6f:.fia£L - SIGNATURE; s; RELEASED BY; __ _ DATE: 1 - Blank 5 - Final Clearance (insido) SIGNATURE: 2 - Pre-Abatement 6 - Final Clearance (outside) RECEIVED BY: DATE:^®^ 3 - During Abatement 7 - Personal SIGNATURE: ________ 3 fC,’ 4' During Glove Bag Removal 8 - Background SEE REVERSE SIDE FOR AHALV3O INFORMATION
NYC-WTC_000359480
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000339722
Air monitoring log with TEM/PCM data; site: DDC 30th Street project.
1 shared topics · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268865
Monitoring log with sample descriptions, flow, and times for TEM/PCM.
1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388739
Air monitoring log/COC form for AHERA sampling; 7400 AHERAV2 level and SCAs noted.
1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359477
Air monitoring log and chain-of-custody details for 7400 location.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280504
Air monitoring log sheet and chain-of-custody for PCM TEM analyses at WTC sublevel site.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361434
Air monitoring log and chain-of-custody form for PCM/TEM AHERA analysis.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356865
Air monitoring log and chain-of-custody for TEM/AHERA analysis on 30th floor.
1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000364390
Air monitoring log sheet with chain-of-custody for project on site, client Warren & Panzer.
1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282334
Air sampling log and custody details for project work at 220 East 48th Street
1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000431379
Air monitoring log and chain-of-custody for WTC project sampling.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000344127
Air monitoring log/chain-of-custody form for 228 East 45th Street project with PCM/TEM options.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282230
Air monitoring log sheet and chain-of-custody form for a project at 228 East 45th Street, 2002.
1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000269287
Air-monitoring log/chain-of-custody for TEM analysis at DDC site.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000339722
Air monitoring log with TEM/PCM data; site: DDC 30th Street project.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000345239
Air monitoring log/chain-of-custody form for PCM sampling at 228 East 45th Street, 2002.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268865
Monitoring log with sample descriptions, flow, and times for TEM/PCM.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000359477
Air monitoring log and chain-of-custody details for 7400 location.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186539
Chain of custody and air monitoring log sheet for samples collected by Warren & Panzer Engineers at the World Trade Center site.
Similarity score 0.978 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000364390
Air monitoring log sheet with chain-of-custody for project on site, client Warren & Panzer.
Similar indexed content
NYC-WTC_000339722
Air monitoring log with TEM/PCM data; site: DDC 30th Street project.
Similar indexed content
Monitoring log with sample descriptions, flow, and times for TEM/PCM.
Similar indexed content
NYC-WTC_000388739
Air monitoring log/COC form for AHERA sampling; 7400 AHERAV2 level and SCAs noted.
Similar indexed content
NYC-WTC_000282334
Air sampling log and custody details for project work at 220 East 48th Street
Similar indexed content