OSHA SAMPLING RESULTS SUMMARY AS OF 2/13/02
Asbcsios; A total of 1027 samples (excluding bulk and blank samples) for asbesics have been taken. From 9/13 -9/21, 177 samples were taken in the financial district. They were taken on OSHA personnel as they walked within certain predetermined zones. Results revealed asbestos concentrations ranging from ND (none detected) to .037 f'ce., well beiow OSH.'f’s permissible exposure limit (PEL) of 0.1 f/cc. After 9/21, sampling focused on the rubble pile and those workers working on or immediately ne.xt to it. 139 of the samples analyzed exceeded OSHA’s limit via PCM analysis. However, upon further analysis using discriminating counting methods and/'or TEM analysis, the number of asbestos fibers found dropped dramatically to beiow detectable levels or well below .1 f/cc.
Carbon Monoxide: A total of 109 personal samples of workers on the rubble pile showed results ranging from 1 ppm to 34 ppm which are well below the OSHA permissible exposure limit of 50 PPM.
Noise; OSHA is monitoring the noise exposures of employees who perform (or work near) noisy operations such as jack hammerinc and drilling. To date the 95 samples collected indicate that employee noise exposures range from 75.7 dB.A to 94.5 dBA. One personal sample and one area sample taken durins core drilling operations have exceeded the applicable permissible exposure limit of 90 dBA. Accordingly, OSHA continues to recommend the use of appropriate hearing protection in noisy operations.
Total Dust (PNOR) A total of 141 samples (excluding bulk and blank samples) for total dust in and around the rubble pile were taken. 5 samples were found to be in excess of the PEL for Total dust (15mg/m3). The highest exposure was found on one operator who was exposed at approximately 4.PEL. Respirable Siiica; Tlie ox'cnvhclming majority of 674 silica samples (excluding bulk and blank samples) show no delectable levels of airborne silica. However, 41 exposures exceeded the PEL. The hiuliest sample result was approximately twentv-ont times the OSH.A iimil (jack hammerins concrete 16 feet below Grade). The other elevated exposures were approximately one to fourteen times the OSHA limit. These exposures Occurred during: 1) pre-drilling /slurry wall 2) jack hammerinc, 3) rubble removal and loading operations near the Winter Garden; 4) during the breaking up of concrete in the pit; 5) while
Page 1 of 3
This Document is a duplicate created by the WTC Unit of the New York City Law Department
CITY_21MC100_010405079 NYC-WTC_000359469
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388110
OSHA asbestos and noise monitoring results from rubble pile area and surrounding zones.
22 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186425
Summary of OSHA sampling data for asbestos, lead, and noise exposures at the World Trade Center site as of February 2002.
22 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280323
Asbestos results; high-number samples exceeded limits but fibers reduced after TEM/PCM.
22 shared non-person entities · 1 shared topics · similarity 0.997
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388966
OSHA asbestos sampling results at WTC site; high exposure areas identified but overall levels low.
23 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360679
OSHA asbestos air monitoring; disposal of samples and TEM reanalysis near rubble pile; exposure within limits.
23 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341895
Asbestos and noise results from financial district and rubble pile workers.
23 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388602
OSHA sampling results summary for asbestos, noise, and rubble-pile exposures as of 2/13/02.
21 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000320811
Asbestos sampling totals and rubble pile exposures through Feb 6, 2002; PCM/TEM analyses noted.
23 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000268347
OSHA asbestos sampling results and analysis summary at financial district rubble area, with fiber counts and exposure limits.
21 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280216
Summary of asbestos sampling in Financial District and rubble pile; TEM/PCM follow-up.
23 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000318147
OSHA asbestos and noise monitoring results for rubble pile area workers.
22 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000320798
Comprehensive OSHA asbestos sampling summary up to Jan 26, 2002 around WTC debris and rubble pile.
23 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000276809
OSHA air and personal sampling near the rubble pile with PCM/TEM follow-ups and exposure limits.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000354290
January 26, 2002: 120 rubble pile samples; 108 exceedances; noise monitoring ongoing.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388602
OSHA sampling results summary for asbestos, noise, and rubble-pile exposures as of 2/13/02.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000187704
Summary of OSHA sampling results from the financial district and rubble pile showing asbestos levels below exposure limits.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000320798
Comprehensive OSHA asbestos sampling summary up to Jan 26, 2002 around WTC debris and rubble pile.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360688
OSHA sampling results as of Feb 2002; asbestos and noise monitoring near rubble pile.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388110
OSHA asbestos and noise monitoring results from rubble pile area and surrounding zones.
Similar indexed content
NYC-WTC_000186425
Summary of OSHA sampling data for asbestos, lead, and noise exposures at the World Trade Center site as of February 2002.
Similar indexed content
NYC-WTC_000280323
Asbestos results; high-number samples exceeded limits but fibers reduced after TEM/PCM.
Similar indexed content
NYC-WTC_000388966
OSHA asbestos sampling results at WTC site; high exposure areas identified but overall levels low.
Similar indexed content
NYC-WTC_000360679
OSHA asbestos air monitoring; disposal of samples and TEM reanalysis near rubble pile; exposure within limits.
Similar indexed content