NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Memo: site priorities and ventilation, 11/2001

Machine-extracted title · confidence 29%

Site activities and safety recommendations regarding egress and exposure controls.

NYC-WTC_000357898–000357899
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

t .z tA

11/7/2001

To: Bob Adams - DDC From: Mike Ramsey - Liberty Mutual

Re: Liberty Mutual IH Activities

Bob: This is to brief you on my current priorities and activities since I came onto the site on 11/3.

Confined Space Entry.

1. Visited Rt 1 & 9 subway tunnel with John Rabovsky and Eric Rudolph from Liberty Mutual on 11/2 and again on 11/3 with Mike Donovan of ATC to do remote air monitoring. Provided input into Liberty Mutual Safety recommendations regarding this exposure.

In my opinion, the main problem is lack of an additional means of quick egress from this space. J This has been addressed so far by adding a ladder into a second hole above the subway tunnel. However, even with the second ladder, 1 believe the two access holes are too close together (about 40’ separation) to serve as two separate egress routes because workers will not often be between the openings A more “remote” second means of egress would be desirable.

Unfortunately, the closest additional means of egress is the subway entrance stairs under Bldg #5 which are blocked off. The next existing exitnorth of the job would be all the way to the Chambers street station, which is currently an active station and probably not a suitable means of egress because of the danger of train traffic and the condition of the connecting section of tunnel.

2, I recommended to Liberty LP that they do a JHA on the Route 1 & 9 subway tunnel job. Results of the JHA fin this specific job can be used as a model JHA for all future confined space entry Jobs on the site.

Dissemination of Air Sample Results

1. There has been a delay in reporting air sample results due to the transition between Bechtel and Liberty Mutual ffl. No scheduled air samples have been missed, but the reporting of results has been delayed.

On 11/5, Dave Chang from ATC began doing the final quality control on all of the samples collected under the auspices of the Bechtel contract. Dave said that this should be completed by the end of the week, after which they will be returned to me for dissemination.

2. Once this last batch of samples from the Bechtel contract is completed, the Liberty CIH will be doing the second QA review on future sample results, so this will cut down on turnaround time.

3. Ittthe long term, additional efficiencies should be achieved by streamlining the data entry and quality control process. If ATC begins using Liberty Mutual’s lab, the review process will be streamlined because Liberty’s air sample result management software will automatically transfer the results into a spreadsheet for use for sample results dissemination.

CITY_2 IMC10’o_o 0 9 2 5ol 06

NYC-WTC_000357898

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000357898Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →