NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

JCC construction proposal, WTC recovery

Machine-extracted title · confidence 40%

Proposal to perform site work: sand, soil, railing, and roadway work at WTC site.

NYC-WTC_000356811–000356813
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work:

• Remove and replace sand in playground area. Removal by use of vacuum truck. (See note A below) 48’x26’x8”=30cy to include demolition and restoration of pipe railings and fence required to access work area for loading & installation for new sand approx. 30 cy $13,500,00 • Remove and replace sand in volleyball court area. Removal by use of vacuum truck. (See note A below)150x80xl2=300cy to include demolition and restoration of pipe railings and fence required to access work area for loading & installation for new sand appro.x. 250 cy 525,000.00 • Remove top 6’’of soil in bocce court area. Removal by use of bobcat. (See note A below) 55’x30'x8" == 40 cy to include demolition and restoration of pipe railings and fence required to access work area for loading & installation for new sand approx. 40 cy 510,500.00 » Replace damaged railing along Pier 25. Remove and replace all wood top handrails 500 If. Powerwash’eitWbTaiTing along pier."Repair damaged curb as needed 597,500.00 ♦ Excavate and remove temporary asphalt roadway. Excavate and remove all gravel under temporary roadway. Excavate and remove of soil beneath gravel to elevation equal to bottom of the adjacent paving stone. (Betv^een N. Moore St. and School) (See note A below) 5235,200.00 • Remove debris, patch as needed and-pew«^^vash temporary bide path. Paint lines as required to match the existing bike patli (between N. Moore St. and School) (See note A below) $15,500.00 • Note A; All debris and sand being removed shall be coordinated with Weeks Marine for loading up and removal via barge. This removal work to take place during the week following the last truckload from the WTC Recovery Site. Tentatively the last load is scheduled for 5/11/02, therefore removal to take place between 5/12/02 and 5/17/02 (date of crane being demobilized from Pier 25). • All repair and replacement work to occur following the demobilization of the crane (5/17/02) from Pier 25. All repair/replacement work to be complete by June 7,2002. • Working hours at pier 25 me between 7 am and 7pm, • Contractor to enroll in NYCDDC OCIP program with Liberty Mutual insurance. • No sales tax to be included in the proposal.

CITY_21MC100_001777507

NYC-WTC_000356812

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356812Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000251944

Proposal outlining scope of work for WTC Recovery project tasks (playground, sand, railing, etc.).

Similar indexed content

NYC-WTC_000290803

Proposal to remove/replace sand and soil, railing, and other improvements at World Trade Center Recovery project.

Similar indexed content

Compare copies and versions →