Daily work force report, World Trade Center, Dec 13, 2001

Machine-extracted title · confidence 32%

Night shift daily workforce and equipment for World Trade Center, Dec 13, 2001.

NYC-WTC_000356736
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

RAGE CONTRACTING CORP. ^SGlhRoad. Whileslona. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 13, 2001 (NIGHT FINAL) 6:00AM DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions VERY MILD AND FOGGY

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER 1 LABORERS____________ 19 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 9 TOOL VAN ROLL OFF ___________________________________ DUMP TRAILERS •>0 AND 375 PULLING MATERIAL FROM SLOPE LOW BED TRAILER JRTH OF VISTA & PASSING TO TO 750 - 750 LOADING HIGH DECK TRAILERS - WlLY EUKES & FLATS IN BOTTOM OF PIT __ WELDING TRUCK 973 ALSO LOADING IN BOTTOM_______________________ FUEL TRUCK 1 365 UP ON TOP - LOADING TRAILERS PICKUP TRUCKS 2 LIGHT TOWERS 13 TRUCKING PROVIDED FOR ENTIRE SITE SITE MULE 3 DUMP TRUCKS 973 LEAKING MOTOR OIL 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 375 - FORCED AIR SYSTEM BRACKETS BROKE OFFICE TRAILER/GENER. 1 CARGO BOXES 3 38 LOADS - GRACE - NORTH ROAD FLAT TRUCK 1 69 EUKES ANO 9 FLATS - BELOW pjMP 2 78 OUT OF AMEC (53 GRACE. 25 DOS/DOT) ROLLER RAINMAKER/GENIE LIFT 1 — " — 550 BUCKET 1 Description of Work; WORK PERFORMED__________ LOAD OUT STEEL ANO DEBRIS MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR OUST CONTROL_________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2

SET MATS FOR TIEBACK INSTALLATION ELEVATIONS; ALL MACHINES LEVEL B-5 253

GRACE CONTRACTING CORP J^^roved By; BY; jX, SUPERINTENDENT *

DAILY WORK FORCE REPORT 1213N.xls

CITY_2IMCl00_001761300 NYC-WTC_000356736

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356736Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →