NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 12, 2001

Machine-extracted title · confidence 32%

Final daily workforce and equipment for World Trade Center, Dec 12, 2001.

NYC-WTC_000356733
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151 45 6)h Hoad. Whilestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 12, 2001 (DAY) FINAL DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor 4I Equipment

rz______ ! SUPERINTENDENT CLASSIFICATION QUANT ntI 1 Description |[|CAT 966 LOADER MANNED STANDBY IDLEi 1 PROJECT ENGINEER 2 If CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 [CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 23 HITACHI 750 GRAPPLER 1 IIhITACHI 550 GRAPPLER 1 IRON WORKERS 1 LOCAL 14 5 ^HITACHI 550 GRAPPLER 1 JhITACHI 1200 GRAPPLER~ 1 LOCAL 15 10 ||t85 CFM COMPRESSOR 1 CARPENTER 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOLTRUCK 1 HOUSE WRECKERS 9 TOOL VAN 1 ROLL OFF jpUMP TRAILERS ||lOW bed TRAILER DELIVERIES; AWISCO HIGH DECK TRAILERS I WELDING TRUCK 1 1FUEL TRUCK 1 I PICKUP TRUCKS 9 j LIGHT TOWERS 13 [ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ' FLASHING ARROW BOARD 1 ■ OFFICE TRAILER/GENER. 1 ICARGO BOXES 3 liFLAT TRUCK 1 LIGHT TOWERS USED FOR 2.5 HOURS [PUMP 2 [[ROLLER 1 iRAINMAKERyGENlE LIFT 1

Description of Work:

LOAD OUT STEEL AND DEBRIS_______________________________________ MANNED TARPING AND TRIMMING STATIONS_____________________________________ MANNED WATER STATIONS FOR DUST CONTROL______________________________ - MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF GPS SYSTEMS_________________________________________ ELEVATIONS: ALL MACHINES LEVEL B-5 253__________________________ _J__ LOADS OUT 46 , ' GRACE CONTRACTING CORP Approved By: Title; BY: For; SUPERINTENDENT - .

DAILY WORK FORCE REPORT 1212D.xls

CITY_2IMCl0 0_0 01761297 NYC-WTC_000356733

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356733Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →