Daily work force report, World Trade Center, Dec 5, 2001

Machine-extracted title · confidence 32%

Night shift daily workforce and equipment for World Trade Center, Dec 5, 2001.

NYC-WTC_000356730
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE; DECEMBER 5, 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

iJob Name & Location: World Trade Center Contract No. Weather Conditions

Labor It Equipment classification QUANT. Description MANNED STANDBY IDir Superintendent 2 CAT 966 loader 1 PROJECT ENGINEER 1 cat 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 Foremen 2 CAT 365 GRAPPLER 1 [SAFETY OFFICER CAT 375 GRAPPLER 6 Hrs. 6 Hrs. LABORERS 20 HITACHI 750 GRAPPLER 1 [iron WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 6 Hrs. 6 Hrs. TEAMSTERS 10 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK 1 HOUSE WRECKERS 10 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 IdUMP TRUCKS Iio WHEEL DUMP TRUCK ~ Iflashing arrow board 1 loFFICE TRAILER/GENER?~ 1 |CARGO BOXES 3 IfLAT TRUCK ~ 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work; _______________ LOADS OUT: 27 HI-BEDS/DUMP TRAILERS; 34 EUCLIDS_______________________________________________________ LOAD OUT STEEL AND DEBRIS____________________________________________________________________________ MAN TARPING AND TRIMMING STATIONS________________________________________________________________ _ MAN WATER STATIONS FOR DUST CONTROL_______________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY ELEVATIONS: ALL MACHINES LEVEL B-5 253_________ ____________________________ _______ .... .... ...._______ DELAYS FROM 7-1 PPM FOR FREON RECOVERY; AND MULTIPLE BODY RECOVERIES, 41, k /u1..-|-. GRACE CONTRACTIN^G CORP y Approved By: Title; BY: For; SUPERINTENOeNT

DAILY WORK FORCE REPORT 1205N.xls

NYC-WTC_000356730

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356730Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →