GRACE CONTRACTING CORP. ,5t-«56lli Roat . wnnestone. N Y. 11357-(718) 767-SOdO DATE: DECEMBER 1,2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name 8 Location; World Trade Center Contract No Weather Co iditions
Labor Equipment CIASSIFICATION UANTIT |[ Description MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE EN 5INEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OF HCER 1 CAT 375 GRAPPLER 1 18 HITACHI 750 GRAPPLER 1 IRON WORK ERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTE ? FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTER, 11 MECHANICS TRUCK 2 MECHANIC! 2 TOOL TRUCK 1 HOUSE WR ECKERS 7 TOOL VAN 1 ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 AWiSCO OXY/ACET WELDING TRUCK 1 AWISCO TIPS FUEL TRUCK 1 AWISCO OXY/ACET PICKUP TRUCKS 7 LIGHT TOWERS 9 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER.~ 1 jC-.CGO BOXES 3 FLAT TRUCK 1 PUMP^Z 2 ROLLER 1 RAINMAKEFVGENIE LIFT 1 = Description t iWork_________________________________________________________ GATEWAY! 50 DELAYS 7 AM-1;15 PM SEARCH AND RESCUE PORT AUTH P D 365 1-2PM FIREDEPT SEARCH IN SLURRY WALL NEAR PANEL 25 CONTINUE 'O EXTEND ROAD NORTH OF TOWER 2 AND MEET UP WITH AMEC. MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN T RAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2_____________________________________________ CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP W/ AMEC ELTVATiCNS; 1200-264, 550-274, 375-284, 365-274 LOADS OU1 49 res' ] Approved B)): Title: For; SUPERINTENDENT
CITY_2IMCl0 0_0 01761278 NYC-WTC_000356723
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388361
Daily workforce and equipment counts for World Trade site in Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279004
Daytime workforce and equipment list for World Trade, December 2, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388474
Night shift daily workforce and equipment at World Trade site, Grace Contracting, Nov 29, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302469
Day final daily workforce and equipment for World Trade site, Dec 20, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388710
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280772
Night shift daily workforce and equipment at World Trade Center, Dec 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280079
Daily workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291386
December 2, 2001 day final daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305595
Night final daily workforce and equipment at World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000388361
Daily workforce and equipment counts for World Trade site in Dec 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279004
Daytime workforce and equipment list for World Trade, December 2, 2001.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388474
Night shift daily workforce and equipment at World Trade site, Grace Contracting, Nov 29, 2001.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305240
Final daily workforce report for World Trade Center project, listing crews and equipment.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388361
Daily workforce and equipment counts for World Trade site in Dec 2001.
Similar indexed content
NYC-WTC_000432485
Final daily workforce and equipment report for World Trade Center, Dec 1, 2001.
Similar indexed content
NYC-WTC_000279004
Daytime workforce and equipment list for World Trade, December 2, 2001.
Similar indexed content
NYC-WTC_000388474
Night shift daily workforce and equipment at World Trade site, Grace Contracting, Nov 29, 2001.
Similar indexed content
NYC-WTC_000305366
Daily workforce and equipment counts for World Trade Center site, Dec 1, 2001.
Similar indexed content