Daily work force report, World Trade Center, Nov 25, 2001

Machine-extracted title · confidence 42%

Final daily workforce and equipment for World Trade Center project, Nov 25, 2001.

NYC-WTC_000356713
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 61h Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: SUNDAY NOVEMBER 25, 2001 DAY (FINAL)

)' DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor_________ I ____________ Equipment CLASSIFICATION UANTITir Description MANNED STANDBY] IDLEi SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN_____________ 2 CAT 365 GRAPPLER CAT 375 GRAPPLER SAFETY OFFICER __L_ LABORERS____________ 23 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14_________ LOCAL 15_________ CARPENTER_______ I HITACHI 550 GRAPPLER HITACH11200 GRAPPLER 165 CFM COMPRESSOR 1 d £ CARPENTER FOREMAN TEAMSTERS I MECHANICS TRUCK TOOL TRUCK_____________ £ MECHANICS___________ HOUSE WRECKERS ? TOOL VAN ROLL OFF DUMP TRAILERS__________ 1

6 DOT DUMP-4 LOW BED TRAILER________ HIGH DECK TRAILERS DOS DUMP-2 WELDING TRUCK FUEL TRUCK_____________ I PICKUP TRUCKS__________ LIGHT TOWERS___________ 9 PARTS TRUCK____________ 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER CARGO BOXES___________ FLAT TRUCK_____________ ■ PUMP____________________ 2 t 1

■ 85- FOOT GENIE J__ I ANGEL AERIEL(DUST SUPR) J__ 1 GENERATOR______________ 1 ijcAT 235 HOE RAM 3 Description of Work;_________________________________________________________________________ _______________ LOADS OUT; 102_____________ ____________________________________________________________________ _ MAN TARPING AND TRIMMING STATIONS ________________________________________________________ __ MAN WATER STATIONS FOR DUST CONTROL_____________________________________________________________ _ MAINTAIN TRAFFIC FLOW IN ANO OUT OF AREA______________________________________________________ _ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND CREATING THE RAMP AT THE NORTH / WEST CORNER & WORKING EAST TO B5-B6 &SOUTH TO MEET ROADWAY FROM B5-B6.

GRACE CONTRACTING CORF Approved By; Title; BY:___________ For; (superintendent

NYC-WTC_000356713 CITY_21MC100_001761266

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356713Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280004

World Trade Center workforce and equipment data for December 4, 2001.

Similar indexed content

Compare copies and versions →