GRACE CONTRACTING CORP. ISMS 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/27/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description I MANNED STANDBY IDLE SUPERINTENDENT CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER_________________________ CAT 375 GRAPPLER 2 LABORERS 9 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 15 5 HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN____________________ 1 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL) 1 MECHANICS TRUCK 2 TEAMSTERS (FLATBEDS, DUMPS. AND EUKES) 14 TOOL TRUCK MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS ROLL OFF DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES: WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
Description of Work;
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2______________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA OF TOWERS________________________________________ SPOT FOR MACHINES IN TOWERS EXCAVATE TOWER 1 TO B 6 FOR BRIDGE EVCAVATE NORTH OF TOWER 1 TO ACCOMMODATE NEW ROAD FOR TIE BACKS. EXCAVATE EAST OF MER ROOM FOR NEW ROAD LOADS OUT 1Q8_______________________________________________________________ _________________ YUKELOADS 153 DOT LOADS 81 GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0127D.x!s
CITY_21MC100_010385227
NYC-WTC_000356570
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305184
Daily workforce and equipment details for World Trade, Jan 29, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306053
Daily workforce report listing labor classifications and equipment at World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356564
Daily labor/equipment roster for World Trade site, Jan 24, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263634
Night shift daily workforce and equipment at World Trade site, Jan 23, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429397
Day shift daily workforce and equipment details for World Trade site on 1/20/02.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302459
Day final daily workforce and equipment for World Trade project, Dec 23, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356576
Day shift daily workforce and equipment roster for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429378
Night shift daily workforce and equipment list for World Trade site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302462
Night preliminary daily workforce and equipment for World Trade site, Dec 22, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302466
Night preliminary daily workforce and equipment for World Trade site, Dec 20, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305184
Daily workforce and equipment details for World Trade, Jan 29, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280006
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306053
Daily workforce report listing labor classifications and equipment at World Trade Center site.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356564
Daily labor/equipment roster for World Trade site, Jan 24, 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263634
Night shift daily workforce and equipment at World Trade site, Jan 23, 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429459
Day shift workforce and equipment at the World Trade Center project.
Similar indexed content
NYC-WTC_000305184
Daily workforce and equipment details for World Trade, Jan 29, 2002.
Similar indexed content
World Trade Center site labor and equipment by Grace Contracting, December 3, 2001.
Similar indexed content
NYC-WTC_000306053
Daily workforce report listing labor classifications and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000356564
Daily labor/equipment roster for World Trade site, Jan 24, 2002.
Similar indexed content