Environmental consultant memo to client, asbestos survey

Machine-extracted title · confidence 28%

Memo regarding asbestos survey and environmental consulting services for proposed project.

NYC-WTC_000356459–000356461
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Jan 22 02 O8;37p Rirtek Environmental Corp (212)768-0759 P.3

Mr. David W. Prendergast -1/22/02 Engine Company 10, Ladder Company 10 Air&k Piopasai mZ EQ 10

Task UI:

ACM Design

Upon detenninatioft ef He scope ef ahalsmeHt required to implement the planned alterations, Airtek will provide Certified Personnel to prepare specifications and drawings with estimates forme-abatemeBt of ACM-

Taik tV:

Project Monitoring^Air Monitoring

Airtek will provide a NYS Licensed Asbestos Project Monitor to oversee the work practices of the asbestos removal contractor and to collectair samples as requiredby law. The Project Monitor will act as a representative of the owner and will report any incidents of non- compliance with the law to the owner. AirtckY Project Monitor wiH-arse contisuGusiy sample air around the work area to determine if airborne fiber counts exceed reguiatory limits before, during and at the conclusion of the project AH air samples will be analyzed, by Phase Contrast Microscopy (PCM) at an NYS DOH ELAP approved laboratory.

Lt TENSATI ON; The Consultant will be compensated for this Project as follows;

Tasks I and D (ACM Inspcction/Sasrspliag and Preparation of Survey Report)

Project Manager 23 hours @ $65 00/hour =$ 1,495.00 NYS AMsestos-inspectsir 32 bouts r® S55.00/hour =$ 1760.00 Report and Drawing Preparation 10 hours @ $55.00/hour =$ 550.00 PLM Bulk Sampte Analyses 80 samples @ $16.00/sample =5 1280.00 PLM nob Bulk Analyses 80 samples @ .S20.00/sainpre =$ 1600:00^ TEM NOB Bulk Anaiy x's S85.00/saraple - As Required by Law

Estimated Sub-Total =$6,685.00 (Excludes TEM analyses to be pre-approved by CLIENT)

Tasks m (ACM Project Design)

Project Maflager 4 haurs @ S65.00.<hour =S 260.00 Asbestos Project Designer 20 hours @ S65.00/hour = $ 1,300.00 Drawings preparation by Designer 30 hours & $65.00/hr =$ 1,950.00

EstiiBated Sub-Total =$3,510.00

Task IV (Project Monitoring/Air Monitoring)

Project Manager SSS.OO/hour Project Monitor S45.00/hour PCM -Air Sample Analyses S16.00/sampre

EstunaleiSub-Tota!: To be Determined based on scope of asbestos abatement

NYC-WTC_000356460

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356460Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →