NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Codified records of documents and custody in DOT files.
NYC-WTC_000355074–000355754OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
§ 40.67 49 CFR Subtitle A (10-1-98 Edition) the form. The employee shall sign the § 40.67 Refusals to test and certification and fill in the date in uncompleted tests. Step 4 of the form. (a) Refusal by an employee to com- (2) If the employee does not sign the plete and sign the breath alcohol test. certification in Step 4 of the form, it ing form (Step 2), to provide breath, to shall not be considered a refusal to be provide an adequate amount of breath, tested. In this event, the BAT shall or otherwise to cooperate with the note the employee's failure to sign in testing process in a way that prevents the "Remarks" section. the completion of the test, shall be (3) If a test result printed by the EBT noted by the BAT in the remarks sec- (see paragraph (g)(1) or (g)(2) of this tion of the form. The testing process section) does not match the displayed shall be terminated and the BAT shall result, or if a sequential test number immediately notify the employer. printed by the EBT does not match the (b) If a screening or confirmation test sequential test number displayed by cannot be completed, or if an event oc- the EBT prior to the confirmation test curs that would invalidate-the test, the (see paragraph (e) of this section), the BAT shall, if practicable, begin a new BAT shall note the disparity in the screening or confirmation test, as ap- "Remarks" section. Both the employee plicable, using a new breath alcohol and the BAT shall initial and sign the testing form with a new sequential test notation. In accordance with § 40.79, the number (in the case of a screening test test is invalid and the employee shall conducted on an EBT that meets the be so advised. requirements of §40.53(b) or in the case (1) The BAT shall transmit all results of a confirmation test). to the employer in a confidential man- ner. § 40.69 Inability to provide an ade- (1) Each employer shall designate one quate amount of breath. or more employer representatives for (a) This section sets forth procedures the purpose of receiving and handling to be followed in any case in which an alcohol testing results in a confidential employee is unable, or alleges that he manner. All communications by BATs or she is unable, to provide an amount to the employer concerning the alcohol of breath sufficient to permit a valid testing results of employees shall be to breath test because of a medical condi- a designated employer representative. tion. (2) Such transmission may be in writ- (b) The BAT shall again instruct the ing (the employer copy (Copy 1) of the employee to attempt to provide an ade- breath alcohol testing form), in person quate amount of breath. If the em- or by telephone or electronic means, ployee refuses to make the attempt, but the BAT shall ensure immediate the BAT shall immediately inform the transmission to the employer of results employer. that require the employer to prevent (c) If the employee attempts and fails the employee from performing a safe- to provide an adequate amount of ty-sensitive function. breath, the BAT shall so note in the (3) If the initial transmission is not "Remarks" section of the breath alco- in writing (e.g., by telephone), the em- hol testing form and immediately in- ployer shall establish a mechanism to form the employer. verify the identity of the BAT provid- (d) If the employee attempts and fails ing the information. to provide an adequate amount of (4) If the initial transmission is not breath, the employer shall proceed as in writing, the BAT shall follow the follows: initial transmission by providing to (1) [Reserved] the employer the employer's copy of (2) The employer shall direct the em- the breath alcohol testing form. The ployee to obtain, as soon as practical employer shall store the information after the attempted provision of so as to ensure that confidentiality is breath, an evaluation from a licensed maintained as required by § 40.81. physician who is acceptable to the em- [59 FR 7357, Feb. 15, 1994. as amended at 59 ployer concerning the employee's med- FR 43002, Aug. 19, 1994; 60 FR 19679, Apr. 20, ical ability to provide an adequate 1995] amount of breath.
572
NYC-WTC 000355655
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153563
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
4 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115338
License agreement between the City of New York and a landowner for removing foreign material from building exteriors at 211 Pearl Street.
4 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
5 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118384
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102407
Header page of legal correspondence from counsel regarding environmental remediation at 83 Maiden Lane in October 2002.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112508
A license agreement between the City of New York and a landowner to remove foreign material from building exteriors near the World Trade Center site.
7 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118972
Facility inspection form documenting ACM and air monitoring status for a building at 65 Beaver Street.
6 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118359
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127520
Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
6 shared non-person entities · 1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000140626
Draft scope of work for WTC debris/dust residential cleanup program with compliance requirements and regulatory overview.
Similarity score 0.908 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139101
EPA transmits revised scopes of work documents for the indoor dust cleaning and monitoring program, including cleaning SOW #7 and monitoring SOW #7.
Similarity score 0.908 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000139101
EPA transmits revised scopes of work documents for the indoor dust cleaning and monitoring program, including cleaning SOW #7 and monitoring SOW #7.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000340368
New York DOSH Part 56 asbestos regulations and definitions.
Similarity score 0.904 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000166105
FDNY Bureau of Fire Prevention form documenting a standpipe flow test for a specific building in New York City.
Similarity score 0.904 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000340368
New York DOSH Part 56 asbestos regulations and definitions.
Similarity score 0.903 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
Similar indexed content
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
Similar indexed content
NYC-WTC_000115338
License agreement between the City of New York and a landowner for removing foreign material from building exteriors at 211 Pearl Street.
Similar indexed content
NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similar indexed content
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
Similar indexed content