NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 681 pages

Chain of custody log, DOT materials, 1998

Machine-extracted title · confidence 52%

Codified records of documents and custody in DOT files.

NYC-WTC_000355074–000355754
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

§23.45 49 CFR Sutstiiia-A (10-1-98 Edition) firm and personally interview these in- available for inspection during normal I dividuals; business hours at the principal office of (iii) Analyze the ownership of stock the recipient for 30 days following the in the firm, if it is a corporation; date of the notice, and informing the (iv) Analyze the bonding and finan- public that the Department and the re- cial capacity of the firm; cipient will accept comments on the (v) Determine the work history of the goals for 45 days from the date of the firm, including contracts it has re- notice. The notice shall include ad- ceived and work it has completed; dresses to which comments may be (vi) Obtain or compile a list of equip- sent, and shall be published in general ment owned or available to the firm circulation media and available minor- and the licenses of the firm and its key ity-focus media and trade association personnel to perform the work it seeks publications, and shall state that the to do as part of the DBE program; and comments are for informational pur- (vii) Obtain a statement from the poses only. firm of the type of work it prefers to (4) Recipients covered by the dis- perform as part of the DBE program. (g) Percentage goals for the dollar value advantaged business enterprise pro- of work to be awarded to MBEs. (1) Once gram requirements of subpart D of this the recipient has reviewed proposed part shall establish an overall goal and contracting to identify those contract- contract goal for firms owned and con- ing activities which have the greatest trolled by socially and economically potential for MBE participation, the disadvantaged individuals. Other re- recipient shall set goals that are prac- cipients shall establish separate over- tical and related to the potential avail- all and contract goals for firms owned ability of MBEs in desired areas of ex- and controlled by minorities and firms pertise. owned and controlled by women, re- (2) The applicant/recipient shall es- spectively. tablish two types of MBE goals: (5) The applicant shall consider the (i) Overall goals for its entire MBE following factors in setting overall program, for a specified period of time goals: (e.g. one year), or for a specific project, (1) Overall goals shall be based on (e.g. the construction of a facility); and projection of the number and types of (11) Contract goals on each specific contracts to be awarded by the appli- prime contract with subcontracting cant and a projection of the number possibilities, which the bidder or pro- and types of MBEs likely to be avail- poser must meet or exceed or dem- able to compete for contracts from the onstrate that it could not meet despite recipient over the period during which its best efforts. the goals will be in effect. (3)(1) Recipients shall submit their (ii) Overall goals shall also be based overall goals and a description of the on past results of the applicant's/re- methodology used in establishing them cipient's efforts to contract with MBEs with their MBE program. When the and the reasons for the high or low overall goals expire, new overall goals level of those results. shall be set and submitted to the De- partment for approval. Contract goals (6) The applicant/recipient shall re- view the overall goals at least annu- need not be submitted in the appli- cant's MBE program, but the program ally. The review process shall analyze shall contain a description of the meth- projected versus actual MBE participa- odology to be used in establishing tion during the previous year. The nec- them. Contract goals may require ap- essary revisions shall be made based on proval by the Department prior to con- the analysis and submitted to the De- tract solicitation. partment for approval. (11) At the time the recipient submits (7) Goals shall be set for specific con- its overall goals to the Department for tracts based on the known availability approval, the recipient shall publish a of qualified MBEs. notice announcing these goals, inform- (8) Recipients and contractors shall, ing the public that the goals and a de- at a minimum, seek MBEs in the same scription of how they were selected are geographic area in which they seek

202

NYC-WTC 000355285

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000355285Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →