NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 471 pages

Invoice/purchase record, 1996–2001

Machine-extracted title · confidence 25%

MayoPj presentation-related invoice excerpt; City of Philadelphia reference.

NYC-WTC_000354406–000354876
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

installing granite curbing on Broad Street working north from Alter Street and renovating subway entrances. Work is approximately 75 percent complete with an anticipated completion date of June 1996. Work is also proceeding on the restoration of Historic Market Street East, a $6.7 million project. Construction began last year with the installation of a new standard pressure water line and a new gas main. Work is continuing on the SEPTA transit shelter at Front and Market Street. The contractor is also completing the vault roof replacements, footway restoration, and plant bed installation on the south side of City Hall. Work is approximately 80 percent complete with an anticipated completion date of June 1996.

Approximately $54 million was spent from FY93 through FY95 for street construction and improvements. A significant portion of improvements has been completed in the Convention Center area in order to enhance the physical environment and improve the movement of pedestrians and motor vehicles within the area. Other street construction projects have included handicapped-access curb cuts, federal resurfacing projects under the Federal Aid Highway Program, and renovations to the Delaware Avenue Intermodal Terminal.

Over $3 million has been spent for the citywide alley lighting replacement program, street lighting, traffic control, and street signs since FY93. Approximately $8.5 million is programmed in the FY96 Capital Budget for these same types of projects with the bulk of the funds earmarked for alley lighting ($6.1 million). Also, $6 million, including $4.8 million of federal grants, has been programmed in FY96 for an upgrade of the traffic signal system in Center City.

One of the more notable projects scheduled to be completed in 1996 is a biking and walking path from the Philadelphia Museum of Art south to Spruce Street, along with stairways to the riverbank and ramps across the railroad tracks at Cherry and Spruce Streets. This construction project received a $3.2 million federal grant under the Intermodal Surface Transportation Efficiency Act (ISTEA) and is a critical component of the plans for the Schuylkill River Park development. Construction should begin in the spring and be completed by the end of the 1996.

Water Department

The Water Department's capital budget is spent largely on the reconstruction of water mains and sewer systems. Many of the City's distribution and sewer lines are old, deteriorated, or otherwise inadequate for present day use. This reconstruction work consists of cleaning and lining old mains to upgrade their capacity, replacing the mains, or replacing the sewers.

The Belmont High Service Pumping Station, which is part of the drinking water treatment and distribution system, will be replaced with new pumps, controls, and switchgear. The FY96 Capital Budget appropriated $8 million for this project, and construction is scheduled to begin in early 1996 and be completed approximately one year later.

Capital Program Page 399

NYC-WTC_000354874

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354874Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Permit application, Education Dept. · page 91

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.933 (not a probability)

machine-extracted · confidence unavailable · Check page ↗
Permit application, Education Dept. · page 143

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.930 (not a probability)

machine-extracted · confidence unavailable · Check page ↗
Permit application, Education Dept. · page 166

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similarity score 0.928 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000195490

Invoice from the Office of Management and Budget regarding services provided by the Office of the Chief Medical Examiner in 2002.

Similar indexed content

NYC-WTC_000245464

Permit application unrelated excerpt; contains mayoral report and NYC identifiers; likely overarching documents for school-related permit.

Similar indexed content

Compare copies and versions →