NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 19 pages

Analysis of aerosols, WTC site, 2001

Machine-extracted title · confidence 38%

Continuation of aerosol analysis results from WTC site across multiple institutions.

NYC-WTC_000354229–000354247
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

166 T A. CAHILL ET AL.

late September, are not fully understood. Factors which are es­ The unil was sited on the roof at an elevation of roughly 50 m sential for an in-depth analysis are the chemical composition of above the street but lower than most of the surrounding build­ the materials that could be aerosolized and the energy sources ings. Sampling began on October 2 al 12.'20PM and continued in available in the collapse piles. In this regard, the kinetic energy operation with two changes in drums until late December, when of the two aircraft is negligible (< 1 %) compared to the chemical it was shipped back to Davis. Other than a few hours of uncer­ energy in the roughly 25,000 liters of fuel in each plane (some tainty at the beginning of the study (backlash in gears), samples of which was burned outside the buildings). The gravitational were collected during over 99% of all available sampling periods potential energy of the collapse was capable of raising the en­ in October. tire nias.s of debri.s only a few degree.s K. The largest energy sources available are the combustible materials present in the SAMPLE COLLECTION buildings and furnishings and a significant body of fuel, espe­ Samples were collected in a slotted rotating drum impactor cially under WTC tfT, in the form of diesel fuel for emergency (Lundgren 1967), a technique in which the UC Davis Air Quality electrical generators and large quantities of oil in various forms Group and DELTA Group have specialized for the past in the Consolidated Edison substation, also under WTC #7. Very 30 years (some examples are in Cahill et al. 1974, 1981, 1989; high temperatures occurred in the burning floors of the buildings Flocchini et al. 1976; Feeney et al, 1975; Barone et al. 1978; prior to collapse and during the first few' days of active surface Flocchini et al. 1981; Reid et al. 1994; and summarized in fires, as shown by the melting of metals. Later, infrared surveys Cahill and Wakabayshi 1993) totaling almost 17,000 site days showed surface temperature.s in the collapse pile were as high of sampling and analysis, most recently in international studies U.S .70 K above ambient in October, and much higher subsurface of aerosol transport (Reid et al. 1993; Perry et al. 1997, I999)in- temperatures were inferred from the lower portions of removed cluding the large study, ACE-Asia 2001. The present version, an Sled bcam.s glowing red. The subsurface of the collapse pile.s 8 stage rotating drum impactor called a DRUM (Davis Rotating­ remained hot for rnonth.s despite use of massive amounts of wa­ drum Unit for Monitoring) was developed (Cahill et al. 1985; ter to cool them, with the last spontaneous surface fire occurring Raabe et al. 1988), modified (O. Raabe, private communication, in mid-December. 4 October 1997), and labeled the DELTA 8 DRUM. Thi.s sampler .Satellite and photographic observations of the aerosol plumes used the validated models of Raabe et al. (1989) for one of the are extremely useful in characterizing plume transport, espe­ two cases that can be derived analytically, a long slot (Marple cially in the early days when few other measurements were per­ et al. 1986). Note that in Raabe et al. (1989) a universal rela­ formed or are available. On the evening of September 11, the tionship wa.s developed that provided the shape and cut point area of lower Manhattan Island was blanketed with a dark gray of all stages on a single graph, assuming that certain aerody- smoke. On September 12 at 11:30 AM, the Enhanced Thematic iiaiiiic limits, such a.s on the Reynold’s nuinbci, wcie respected. Mapper Plus (ETMd ) aboard the Landsat 7 satellite showed The behavior of the sampler was validated by comparing the :i di.spersed plume moving WNW to SSW in a broad plume predicted pressure drop on each stage to the observed pressure over roughly 120° angular dispersion, while later that same day drop, which was on the average within 2% for Stages 2 through IKONOS showed a whitish coherent plume no more than about 7. The sampler operated at 10.0 L/min, maintained by a critical I).? km wide lofting above the buildings as it moved south to- orifice on Stage 8 (Table 1). ward.s open water (IKONO,S 2001). Heavy rains occurred on The sampler was operated on a 42 day rotation schedule, .September 14, which helped the Fire Department of New York delivering 8 lightly greased Mylar^’’’ strips 168 mm long. All (FDNY) extinguish surface fires while wetting the massive dust stages were coated with a thin (few /rg/cm^) layer of Apiezon- deposits. The plume delected by IKONOS on September 16 was L"” grease applied in a 2% toluene solution (Wesolowski et al. much less intense and much darker than the plume of Septem­ 1978; Cahill 1979). This ha.s proven highly effective in prevent­ ber 12. and the lofting i.s not a.s evident. All of these were ing mis-sizing of coarse, dry particles with less than one part consistent with the improved conditions on the collapse pile in 5,000 of soil mass present at 10 /rm diameter appearing at oh.served during rescue operations. In late September, rescue 0.34 gm (Cahill et al. 1985). operaiion.s gradually ceased and recovery operations began and The physical slot length D w'as 0 605 cm and the effective with them greatly increased fire suppression efforts, including slot length in the deposit was 0.65 cm for all stages, but mass wetting agent,s and use of heavy equipment to begin unpeeling i.s seen distributed laterally, especially on Stage 1, as would the collapse pile. be expected due to the shape of the slots which vary signifi­ cantly from the theoretical “infinite slit" description. However, EXPERIMENTAL TECHNIQUES we measured the effective length of the slit, and the laterally In response to the continuing emissions from the collapse distributed mass was found to come from location.s close to the site, a DELTA Group 8-DRUM sampler was prepared and air end of the slot. Thus, no correction must be included for this expres.sed to the Department of Energy’s Environmental Mea­ effect when converting from areal density of deposit (/ig/ctn^) surement Laboratory (EML) on 201’Varick Street, New York, to concentration (/xg/m’) as long as the effective slot length is a 12 story building roughly 1.8 km NNE of the collapse site used.

CITY_21MC100_006698489

NYC-WTC_000354230

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000354230Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →