’ New York City Department of Environmental Protection Bureau of Environmental Compliance
Monitoring Contractor Scope of Work for 125 Cedar Street, Manhattan
Background
A follow-up visit to 125 Cedar\Street revealed debris and significant dust accumulation present on surfaces tliroughout the interior of the building. The interior cleaning is to be accomplished by a licensed asbestos abatement contractor and monitored by a Monitoring Contractor.
Purpose ; ‘ \
The Monitoring (Contractor shall provide personnel experienced, trained, and certified in environmental sampling and asbestos air monitonng th be on-site, full-time, during work area preparation and cleaning phases of building interiors (12 stories and a penthouse-^fiOO to 6,000 square feet in total). The Monitoring Contractor shall provide qualified staff to observe the work, conduct air monitoring, and monitor the cleanup of the building interiors to en^e compliance with the project specifications and appropriate regulatory requirements. The Monitoring (iontractor .shall provide clearance sampling and analyses.
The Monitoring Contractor shall provide qualified staff to collect samples for lead, polyaromatic hydrocarbons (PAHs), dioxin, fibrous glass, crystalline silica and mercury.
/kn accredited laboratory shall perform all sample analyses.
The Work shall be performed 24 hours per day, seven (7) days per week
Air Monitoring/Construction Inspection Services
Air monitoring by a Monitoring Contractor shall be conducted during all cleanup activities. The Monitoring Contractor shall provide individuals certified as project monitors and air sampling technicians to perform daily air sampling and inspections from the commencement of the project through final air clearance sampling. The Monitoring Contractor shall provide sufficient equipment and experienced personnel to monitor work area preparation and cleaning phases of the building interiors.
Qualifications
Project Monitonng The Project Monitors must posses valid NYS Asbestos Project Monitor certificates. Monitors must have served as a third party project monitor on at least 25 asbestos abatement projects. Project Monitor must have performed final clearance inspections on at least 25 asbestos abatement projects. A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the fimctions of both Monitor and Technician during this project.
1 of 5
CITY_21MC100_003011327
NYC-WTC_000348491
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000206792
Contract scope defining requirements for licensed abatement contractors to clean debris and monitor asbestos air sampling at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000220321
DEP Bureau document defining scope for environmental sampling and asbestos air monitoring during interior cleaning at 125 Cedar Street.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281926
Proposed on-site asbestos cleaning oversight and air monitoring requirements.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281921
Contractor and monitoring requirements for asbestos cleaning at 125 Cedar Street.
16 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000252321
Chain of custody/SC for 125 Cedar Street cleaning and asbestos monitoring scope.
16 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441311
Scope of work for asbestos sampling and air monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445849
New York DEP scope-of-work document for 125 Cedar Street remediation.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434571
Duplicate scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441728
Scope of work for asbestos abatement monitoring and clearance sampling.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434544
Scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
15 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153557
Document defining the scope for a monitoring contractor to oversee cleaning and conduct air sampling for various contaminants.
15 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000441311
Scope of work for asbestos sampling and air monitoring at 125 Cedar Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000445849
New York DEP scope-of-work document for 125 Cedar Street remediation.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000455813
Scope of work for monitoring and cleanup of 125 Cedar Street interior; asbestos sampling included.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434571
Duplicate scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000434544
Scope of work for interior cleaning and asbestos monitoring at 125 Cedar Street.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000330742
Monitoring contractor requirements for on-site asbestos air sampling and clearance measurements.
Similar indexed content
NYC-WTC_000206792
Contract scope defining requirements for licensed abatement contractors to clean debris and monitor asbestos air sampling at 125 Cedar Street.
Similar indexed content
NYC-WTC_000220321
DEP Bureau document defining scope for environmental sampling and asbestos air monitoring during interior cleaning at 125 Cedar Street.
Similar indexed content
NYC-WTC_000153557
Document defining the scope for a monitoring contractor to oversee cleaning and conduct air sampling for various contaminants.