NYC 9/11 Public Portal Document
WKP
LABO^ORIES, INC
AIR SAMPLE ANALYSIS REPORT
PHASE CONTRAST MICROSCOPY
CLIENT: WARREN & PANZER ENGINEERS, P,C. TURNAROUND TIME 2*HRS
WKP FILE # 501-01
SAMPLE DATE .172S/02
WKP LOG 1.0,# N0205151 .N0205158.N020S1S3
RECEIVED DATE 3/23»2
Contract #: VVTCAR2
ANALYSIS Date S.'2W2
REPORT OATS 5flS)02
CLIENT JOB; NYC Department of Environmental “roteetion
CLIENT JOB# 1078.01.01
LOCATION S.W. Area? Site Map
ANALYSIS: AIRBORNE FIBER COUNTING, PHASE CONTRAST MICROSCOPY. NIOSH 7400, NtOSH PAT Lab NO. 07186: NY
COLLECTION DEVICE: 28 oim MCE Filter Casseae; Collection Area « 395 $C| mm;
SAMPLE WERE COLLECTED BY: Warre" and Panzer Engineers. P.O
SUMMARY OF ANALYSIS
CLIENT FIBERS/ FIBERS/
SAMPLE « Sits# SAMPLE LOCATION Vol. sq mm cc
1079.01.01 001 27 Gateway Plaza Park Area 675 1,30 <0.004
002 31 South End Ave, and Abany S:reet 675 0.00 <0.0C4
003 32 West Street and Albany Place 675 2.60 <0.004
004 33A Rector Place by the Park Place 675 1.30 <0.004
005 34 W, rhames Street - Along Waterfront 675 2,50 <0.004
006 37 West of Third Place 675 2.50 <0.004
007 S West Street amf Warren Street 675 1.30 <0,004
008 4 River Terrace and Chambers Street 676 0,00 <0.004
OOS 6A River Terrace Park Area Between Park Place and Warren Street 675 c.oo <0 004
010 9 River Ten ace and Park Place Wes! 675 2,50 <0,004
011 17 River Terrace and Vesey 675 1.30 <0.004
012 7 Warren Streei and Nonb £nd Avenue 675 0,00 <0.(X)4
013 10 North End Avenue Park place West 675 0.00 <0.004
014 28 Thn.ty Place ano Thames Street $75 3.80 <0 004
015 21 Fulton and Church Street 675 0.00 <0.004
016 20A Vesey Street and.West Broadway 675 0.00 <0,004
017 16 Park place and Church Street S75 0.00 <0.004
018 12 Murray Street and Church Street 675 2.60 <0.004
019 15 Park Place and Greenwich Street 676 6.40 <0.004
020 11 Murray Street and Greenwich Street 675 0.00 <0.004
021 Field Blank 0 00
022 Field Blank 0.00
NOTES: 1. 3.5 fibera/lOO fields was used to calculate Lie limit of detection (LOO!.
2. Samples were not collected by WKP LaPoralories, inc.
3. The Federal EPA Clearance Critical following an asbestos abatement project is 0,010 fibers/co.
4 PCM air samples will be disposed of after 3 months unless otherwise directed by client in writing.
L.L.
■ lasoratorycirktoit
CITY_21MC100_003005401
NYC-WTC_000348203
OCR can misread numbers and units. Confirm readings against the page image before using them.