NYC-WTC_000343980
Air monitoring log and chain-of-custody form for project at 228 E 45th, 2002.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗Air monitoring log with custody information and project references.
NYC-WTC_000347869OCR status: ok · source: pdftotext
z z ■<
228 East 45th Street WARREN & PANZER ENGINEERS, P. C. page t OF r . o o i New York, NY 10017 (212) 922-0077 AIR^IOmORING LOG SHEET/CHAIN-OF-CUSTODY FORM CD
I o Fax (212) 922-0630 1^4 hr^/a ] 12 hr'^'/a 6 hr'’‘/a 3 hr'^/a Immediate+/a P.O. ■D c o CT o o' o o W&P FILE #; CLIENT: nVC ■D js. CONTACT; O LABORATORY: 3. 00 PROJECT: "X g) O) co ANALYSIS METHOD: PCM TEM TEM LOCATION: <S ftiT" M O circle one 7400 BERA IPA LEVEL II o o c TECHNICIAN: 3 CD SAMPLE SAMPLE SAMPLE PUMP FLOWRATE TIME TOTAL VOLUME CONCENTR NUMBER DESCRIPTION/LOCATION TYPE # START STOP ON OFF TIME (liters) (fib./cc.) S......... S.O SO -?uo CJfiOX 1800 cWlvieuL ) 3 &.c> &.O oso'f t'lM esmiAJtf ■ 3 s.o s.o 096^0 HOU
wen* 5.0 s.o c8to IHlO Sesutnl 3 5.0 ^.o o9l2J (Mit- '2Uo 19 GO
71 1
COMMENTS: Q H SAMPLE BY; DATE14*>-12- K I SIGNATURE^
I o RELEASED N ) DATE: 1 - Blank SAMPLE TYPE CODES 5 - Final Clearance (inside) o SIGNATURE: I 2 - Pre-Abatement 6 - Final Clearance (outside) o o RECEIVED BY: DATE: 7//^^/^ 3 - During Abatement 7 - Personal LO
tU SIGNATURE: 4 - During Glove Bag Removal 8 - Background I—i o o SEE REVERSE SIDE FOR ANALYSIS INFORMATION
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000343980
Air monitoring log and chain-of-custody form for project at 228 E 45th, 2002.
1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000347875
Monitoring log and custody form for a project; 24/12/6/3-hr intervals.
1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000347862
Initial log sheet and custody form for a lab sample, including contact and P.O. details.
1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000347720
Monitoring log and chain-of-custody form for a project at an NYC location.
1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000344074
W&P air monitoring log with sample details and times.
1 shared topics · similarity 0.941
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000161813
Form recording air sample collection details, flow rates, and chain of custody for laboratory analysis.
1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388104
Air monitoring log and chain-of-custody sheet for Warren & Panzer, related to asbestos sampling.
1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388102
Chain-of-custody form accompanying air monitoring log sheet for durations/dates.
1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000357375
Table of TEM asbestos results for background area samples on 28th floor.
1 shared topics · similarity 0.947
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388095
Air monitoring log and chain-of-custody header for 24/12/6 hour sampling periods.
1 shared topics · similarity 0.945
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278853
Chain-of-custody sheet for air monitoring samples collected by Warren & Panzer.
1 shared topics · similarity 0.944
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322930
Air monitoring log sheet and chain-of-custody record for building-wide sampling.
1 shared topics · similarity 0.938
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000347155
Air sample log/chain-of-custody form for Warren & Panzer Engineers at 228 East 45th Street.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000345286
Air monitoring log/chain-of-custody form for PCM sampling at 228 East 45th Street, 2002.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283317
Air monitoring log and custody form documenting sample handling and file reference.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283275
Air custody form for TEM analysis, NYC DEP W&P file.
Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283381
Air monitoring log sheet and chain-of-custody form for 228 East 45th Street.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000283512
Air monitoring log and chain-of-custody form for a NYC project.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Form recording air sample collection details, flow rates, and chain of custody for laboratory analysis.
Similar indexed content
Air monitoring log and chain-of-custody form for project at 228 E 45th, 2002.
Similar indexed content
NYC-WTC_000347875
Monitoring log and custody form for a project; 24/12/6/3-hr intervals.
Similar indexed content
NYC-WTC_000347862
Initial log sheet and custody form for a lab sample, including contact and P.O. details.
Similar indexed content
NYC-WTC_000347720
Monitoring log and chain-of-custody form for a project at an NYC location.
Similar indexed content