GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/31/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 365 GRAPPLER 1 OFFICE ENGINEER________________________ CAT 375 GRAPPLER 2 FOREMEN 1 HITACHI 750 GRAPPLER 1 SAFETY OFFICER HITACHI 1200 GRAPPLER 1 LABORERS 12 185 CFM COMPRESSOR 1 IRONWORKERS 235 HAMMER HOE RAM 1 LOCAL 14 5 MECHANICS TRUCK 2 LOCAL 15 5 TOOL TRUCK CARPENTER TOOL VAN 1 CARPENTER FOREMAN 1 ROLL OFF TEAMSTERS (FUEL, TRAILER DELIVERY) 1 DUMP TRAILERS 8 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 LOW BED TRAILER MECHANICS 2 HIGH DECK TRAILERS 2 HOUSE WRECKERS WELDING TRUCK 1 FUEL TRUCK 1 ■ PICKUP TRUCKS 6 ■ LIGHT TOWERS 5 DELIVERIES: ■ SITE MULE 3 ■ DUMP TRUCKS ' 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD ■ OFFICE TRAILER/GENER. 1 NOTE' TRUCK 63 RAN STONE FOR TULLY OUT OF QUEENS ■ CARGO BOXES 4 USED THE 375 TILL 12:00 PM, THEN SWITCHED TO ■ FLAT TRUCK 1 MAZZOCHIjS 550. 1200 DOWN AT 10:30 ' ■ PUMP 2
LIGHT TOWERS USED FOR 2.5 HOURS
Description of Work:_________________________________________________________________ COMPLETED WORK________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF WTO COMPLEX, MACHINES AT EL. B6 MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA______________________________________ RECORD TIMES AND NUMBERS OF TRUCK LOADS OF DEBRIS FROM SITE__________________ LOADS OUT:_______________________________________________________________________ YUKES:____________________ ______________________________________________________ DOT LOADS:
GRACE CONTRACTING CORP Approved By; BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0131D.xls 02.214780
CITY_21MC1OO_OO4O28135
NYC-WTC_000342325
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
2 shared non-person entities · 1 shared topics · similarity 0.996
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356577
Night shift daily labor/equipment roster for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263649
DAY FINAL daily workforce report for World Trade Center construction (1/31/02).
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305121
Daily labor/equipment summary for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388409
Saturday/Sunday continues; final daily workforce report for World Trade with equipment.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342291
Nightly daily workforce report for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356577
Night shift daily labor/equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429456
Night shift daily workforce and equipment listing for World Trade Center construction.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429419
Day shift staffing and equipment description for World Trade Center site on 1/31/02.
Similar indexed content
NYC-WTC_000305486
Daily workforce and equipment listing for World Trade Center site, with classifications and quantities.
Similar indexed content
NYC-WTC_000305187
Day final workforce and equipment at World Trade, Jan 31, 2002.
Similar indexed content
NYC-WTC_000356578
Day shift workforce and equipment log for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content
NYC-WTC_000356577
Night shift daily labor/equipment roster for Grace Contracting at World Trade Center site, January 2002.
Similar indexed content