NYC-WTC_000429411
Day shift daily workforce and equipment details for World Trade site on 1/27/02.
1 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment listing for World Trade site, January 2002.
NYC-WTC_000342317OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151.45 601 Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/27/02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor I Equipment CLASSIFICATION QUANT. I Description MANNED STANDBY IDLE SUPERINTENDENT |CAT 966 LOADER 1 PROJECT ENGINEER_______________________ 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 2 LABORERS 9 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 15 5 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL) 1 MECHANICS TRUCK 2 TEAMSTERS (FLATBEDS, DUMPS, AND EUKES) 14 TOOL TRUCK MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS ROLL OFF DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS DELIVERIES; WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK PUMP 2
Description of Work;
CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2_______________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA OF TOWERS_________________________________________ SPOT FOR MACHINES IN TOWERS____________________________________________________________________ EXCAVATE TOWER 1 TO B 6 FOR BRIDGE EVCAVATE NORTH OF TOWER 1 TO ACCOMMODATE NEW ROAD FOR TIE BACKS. EXCAVATE EAST OF MER ROOM FOR NEW ROAD_______________________________ LOADS OUT 108_____________________________________________________________ YUKELOADS 153___________________________________________________________________________________ IDOT LOADS 81 GRACE CONTRACTING CORP .Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0127D.xls 02.214772
CITY_21MC100_000894660 NYC-WTC_000342317
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000429411
Day shift daily workforce and equipment details for World Trade site on 1/27/02.
1 shared non-person entities · 1 shared topics · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419307
Day final daily workforce and equipment for World Trade, January 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263641
Day shift daily workforce and equipment at World Trade site, Jan 27, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291407
Night final daily workforce report for World Trade site, Dec 16, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342291
Nightly daily workforce report for World Trade Center construction.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267312
Day shift labor/equipment roster for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388409
Saturday/Sunday continues; final daily workforce report for World Trade with equipment.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429384
Night final daily workforce and equipment listings for World Trade site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269227
Day final daily workforce and equipment at World Trade, Jan 3, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429383
Day shift roster and equipment details for World Trade site, Jan 2002.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000429411
Day shift daily workforce and equipment details for World Trade site on 1/27/02.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419307
Day final daily workforce and equipment for World Trade, January 27, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263641
Day shift daily workforce and equipment at World Trade site, Jan 27, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291407
Night final daily workforce report for World Trade site, Dec 16, 2001.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342291
Nightly daily workforce report for World Trade Center construction.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000429411
Day shift daily workforce and equipment details for World Trade site on 1/27/02.
Similar indexed content
NYC-WTC_000419307
Day final daily workforce and equipment for World Trade, January 27, 2002.
Similar indexed content
NYC-WTC_000263641
Day shift daily workforce and equipment at World Trade site, Jan 27, 2002.
Similar indexed content
NYC-WTC_000291407
Night final daily workforce report for World Trade site, Dec 16, 2001.
Similar indexed content
NYC-WTC_000305346
Daily workforce and equipment listing for World Trade Center project site, including labor and machine counts.
Similar indexed content