GRACE CONTRACTING CORP. 15M6 601 Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE; 1/15/02 NIGHT FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions: UNSEASONABLY MILD, YET BLUSTERY (35 mph WIND) & COLD. MOSTLY DARK. sssssssssss^^sssssssessassBsss^^s Labor Equipment CLASSIFICATION QUANT, Description MANNED STANDBY IDLE SUPERINTENDENT____________________ 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 9 CAT 375 BUCKET ~ 1 IRON WORKERS HITACHI 750 GRAPPLER~ 1 LOCAL 14 5 HITACHI 550 GRAPPLER LOCAL 15 7 IhITACHI 1200 GRAPPLER" 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS (FUEL) 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOLTRUCK HOUSE WRECKERS____________________ 3 TOOL VAN TEAMSTERS (STEEL AND DEBRIS: EUKES) 14 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 DELAYS: LOST 3.5 HOURS DUE TO FDNY ACTIVITY OFFICE TRAILER/GENER. 1 IN THE HOLE. GRAPPLES DID NOT LOAD IN THE CARGO BOXES 3 HOLE. FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work:_________________________________________________________ _____ COMPLETED WORK_____________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS_______________________________ MANNED WATERING STATIONS FOR DUST CONTROL MAINTAINED TRAFFIC INTO AND OUT OF AREA_____________________________________ APPROXIMATELY 3.5 HOUR DELAY DUE TO FDNY ACTIVITY RELATED TO FIRE IN THE HOLE. LOADS OUT: 83 EUKESOUT: 138
GRACE CONTRACTING CORP Approved By: BY: Title: For: SUPERINTENDENT
DAILY WORK FORCE REPORT0115N.xls 02.214645
CITY_21MC100_004028106
NYC-WTC_000342297
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305158
Night shift daily workforce report with weather notes for World Trade site, January 2002.
3 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356547
Night final daily workforce and weather notes for World Trade site, Jan 15, 2002.
3 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429388
Night final daily workforce and weather notes for World Trade site, Jan 2002.
3 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322119
Night shift daily workforce and equipment roster for World Trade Center project site.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419051
Daily workforce report for World Trade Center site; list of staff and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356477
Daily workforce report listing labor and equipment for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305510
Night FINAL daily workforce and equipment for World Trade Center project, February 2002.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000360493
Night shift workforce and equipment roster at site.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000266655
Daily workforce roster with equipment and personnel at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356575
Night shift daily crew and equipment list for Grace Contracting at World Trade Center site, January 2002.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263632
Night shift daily workforce and equipment at World Trade site, Jan 22, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000306041
Daily workforce report listing labor classifications and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305158
Night shift daily workforce report with weather notes for World Trade site, January 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356547
Night final daily workforce and weather notes for World Trade site, Jan 15, 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429388
Night final daily workforce and weather notes for World Trade site, Jan 2002.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322119
Night shift daily workforce and equipment roster for World Trade Center project site.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419051
Daily workforce report for World Trade Center site; list of staff and equipment.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356477
Daily workforce report listing labor and equipment for World Trade Center project.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305158
Night shift daily workforce report with weather notes for World Trade site, January 2002.
Similar indexed content
Night final daily workforce and weather notes for World Trade site, Jan 15, 2002.
Similar indexed content
NYC-WTC_000429388
Night final daily workforce and weather notes for World Trade site, Jan 2002.
Similar indexed content
NYC-WTC_000322119
Night shift daily workforce and equipment roster for World Trade Center project site.
Similar indexed content
NYC-WTC_000419051
Daily workforce report for World Trade Center site; list of staff and equipment.
Similar indexed content