Daily workforce report, World Trade Center site, Jan 11 2002

Machine-extracted title · confidence 25%

Day shift daily workforce report with labor and equipment details.

NYC-WTC_000342288
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: 1-11-02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor 11 Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 ■ CAT 966 LOADER 1 PROJECT ENGINEER 2 ■ CAT 446 BACKHOE 1 OFFICE ENGINEER ■ CAT 973 LOADER 1 FOREMEN 2 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ■ CAT 375 BUCKET 1 LABORERS 22 ■ CAT 375 GRAPPLER 1 IRON WORKERS ■ HITACHI 750 GRAPPLER 1 LOCAL 14 6 ■ HITACHI 550 BUCKET 1 LOCAL 15 8 ■ HITACHI 1200 GRAPPLER 1 CARPENTER ■ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 ■ 235 HAMMER HOE RAM 1 TEAMSTERS 1 ■ MECHANICS TRUCK 2 MECHANICS 2 ■ TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: TRIBORO HIGH DECK TRAILERS AWISCO WELDING TRUCK 1 FUEL TRUCK 1 ■ PICKUP TRUCKS 8 ■ LIGHT TOWERS 15 ■ SITE MULE 3 ■ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2.5 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 DELAYS; 2 HOUR DELAY, RECOVERY OF FIREMEN FLAT TRUCK 1 LOADING PROCESS SLOWED DOWN. PUMP 2 RAINMAKER/GENIE LIFT 1

Description of Work: J COMPLETED WORK_________________________________________________________________________ __ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA________________ MAN WATERING STATIONS FOR DUST CONTROL__________________________________________________ EXPOSING THE PATH TRAINS___________________________________________________________________ 2 MACHINES LEVEL B-6, EL 242, 3 MACHINES AT LEVEL B-5, EL253 LOADS OUT: 86 EUKES OUT: 226

GRACE CONTRACTING CORP| Approved By: Tide: For: BY: J) SUPERINTENDENT

DAILY WORK FORCE REPORT0111 D.xls 02.214636

CITY_21MC1OO_OO4O28O98

NYC-WTC_000342288

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000342288Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237646

Day shift report from Grace Contracting listing workforce and equipment deployed at the World Trade Center on January 11, 2002.

Similar indexed content

Compare copies and versions →