NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗Day shift daily workforce report for World Trade Center project.
NYC-WTC_000342284OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 15M5 8th Road. Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1-9-02 DAY FINAL
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions
Labor CLASSIFICATION QUANT. r Equipment Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 BUCKET 1 LABORERS 20 CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER_________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 6 TOOL VAN 1 ROLLOFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2 HOURS DURING DAY FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1
Description of Work:____________________________________________________________________________ COMPLETED WORK__________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA________________________________________________ MAN WATERING STATIONS FOR DUST CONTROL_________________________________________________ LOADS OUT: 106_____________________________________________________________________________ EUKESOUT: 192
GRACE CONTRACTING COI Approved By: BY: I Title; For: SUPERINTENDENT
DAILY WORK FORCE REPORT0109D.xls 02.214632
CITY_21MC100_004028095
NYC-WTC_000342284
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302404
Day final daily workforce and equipment for World Trade Center site, January 9, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.993
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342292
Day shift daily workforce report detailing labor and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429383
Day shift roster and equipment details for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429385
Day shift workforce and equipment entries for World Trade site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388409
Saturday/Sunday continues; final daily workforce report for World Trade with equipment.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263614
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305155
Daily workforce and equipment listings for World Trade site, January 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342291
Nightly daily workforce report for World Trade Center construction.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305343
Night preliminary daily workforce log for World Trade Center site, Dec 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237643
Day shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 9, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302404
Day final daily workforce and equipment for World Trade Center site, January 9, 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342292
Day shift daily workforce report detailing labor and equipment.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429383
Day shift roster and equipment details for World Trade site, Jan 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429385
Day shift workforce and equipment entries for World Trade site, Jan 2002.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000290079
Day final daily workforce and equipment at World Trade Center site.
Similar indexed content
NYC-WTC_000302404
Day final daily workforce and equipment for World Trade Center site, January 9, 2002.
Similar indexed content
NYC-WTC_000342292
Day shift daily workforce report detailing labor and equipment.
Similar indexed content
NYC-WTC_000429383
Day shift roster and equipment details for World Trade site, Jan 2002.
Similar indexed content
NYC-WTC_000263615
Daily workforce and equipment roster for World Trade Center site, Jan 2002.
Similar indexed content