WTC project journal entry, 10/03/2001

Machine-extracted title · confidence 40%

Site observations and comments from morning site walk, safety notices, and truck wash station directive.

NYC-WTC_000342131
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^^ite Safety Daily Journal (Page 1 of 2) Project: WTC _____________________ Date: 10/03/2001

Weather:* AM 60 °F Conditions: Clear, variable breeze

PM 80 °F Conditions: Clear, moderate wind from the south

Prepared by: JJM

OBSERVATIONS AND COMMENTS

0700 0730 Site walk. Corrected workers for safety glasses, and respirators, operators for hard hats when out [ of the rig.

0800 1000 Site walk. Corrected workrs for safety glasses. Local 40 requested additional fire extinguishers. ' Bechtel environmental person personnel asked about getting used oil and antifreeze stored in one ' location.

800 1000 At the morning DDC safety meeting they irrformed us that all truckers must stop at wash station and not proceed, until directed. We informed Tom Vario the man signing out all trucks to direct all truckers of the new direction.

1000 1045 Told some of Warrens crew to wear safety glasses. They all refused. Advised Amec supervisors i of the situation and well as Tony Adams from Bectel.

1050 1100 Bectel and OSHA reps requested that respirators be worn by men at atrium. The local 40'fbreman Warren refused to wear it. I requested he be removed from the job.

1100 1145 Bectel and OSHA requested that the 320L operator and the 550 operator keei^ 4 safe distance from each other when working high and low at the customs building. Told operators and also informed the 320 operator to wear safety glasses until the front windsheild was replaced. Spoke with Denny the formen and he said it would be repaired by the morning. 1145 1200 Assisted ERA reps in air sampling on the pile. Site Walk. Comected people about safety glasses

1200 1230 Bectel and OSHA rep requested that a barrier be put up in front of cylinder storage while cutting was ocurring in the area. We installed a sheet of ply wood between the areas and also placed a fire extinguisher in the area.

1356 1410 Bectel and OSHA reps identified an iron worker riding in a sling. Jeff T. interviewed crane operator and spoke with foreman. He was told if individual does it again he will be kick off job.

1500 1530 Corrected workers for ard hats, resp, and eye protection.

1600 1630 Bectel (Bob McFawley) commented that the attachments for hoisting may need to be reviewed, latches should be on hooks.

ignature of Preparer: Date: 09/28/2001

Generated by: Safety Department Date: 05/01

CITY_21MC100_006695755

NYC-WTC_000342131

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000342131Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Site journal, WTC construction, October 2001

NYC-WTC_000186496

Daily site log recording weather conditions, safety observations, and personnel activities at the World Trade Center construction site on October 4, 2001.

Similar indexed content

Compare copies and versions →