NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Change in IH Sampling Plan, Dec 2001

Machine-extracted title · confidence 52%

Draft change in industrial hygiene sampling plan due to reduced exposures and odors at the site.

NYC-WTC_000341540
Page image
Scanned page image, NYC-WTC_000341540
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

12/13/01

To: Bob Adams - DDC From: Mike Ramsey - Liberty Mutual

Re: Change in IH Sampling Plan

Bob: Mike Donovan, Fred Burkhardt, and discussed the following revised sampling plan and are submitting it for your approval. These changes are made in response to the reduction in exposures from products of combustion, the very low results from previous samples for certain analytes, the identified increase in noise exposures and the recurring detection of sulfurous odors in the SW comer of the site.

Would you please look this over and give us your approval/conunents?

The main differences in this plan compared to the old plan are:

Reduction of the number of aldehyde, asbestos, acid, PAH, and aromatics. Because of the lack of findings from past sampling and the dwindling of underground fires.

• Addition of regularly scheduled noise measurements. Due to the increase use of gasoline powered tools (chain saws for cutting shoring lumber) and pneumatic tools.

Addition of samples for hydrogen sulfide and sulfur dioxide in the SW corner of the site. This will be a combination of area samples and personal samples.

• Slight reduction in the number of asbestos samples because of low results. The emphasis will still be on the Tower 1 area.

The plan will keep the total sample numbers at about the same at about 103 samples per week compared to about 110 per week in the current plan. However, the area samples and the decreased calibration time for dosimeters vs. pumps should allow us to reduce the number of technicians needed (See next point below).

Reduce technicians from 4 per shift to 3 per shift. Under Bechtel, the sampling plan called for about 150 samples per week (2.7 samples per technician per shift). The new sampling plan calls for about 100 samples per week (1.7 samples per technician per shift). Using 3 technicians would give 2.4 samples per technician per shift. Fred Burkhardt indicated that he did not want to go much more than 2 samples per tech, but think that, if the reduction to 3 works, we should consider further reducing the staffing to 2 technicians per staff which would mean 3.4 samples per technician.

• Reduce technician hours from 12 to 10 hours per shift. I think two hours on either end of sampling is excessive and could be reduced to one hour, considering each technician only needs to prepare and log 2 to 3 samples.

The following page contains a table that compares the old sampling plan with the new one.

CITY_21MC100_006695460

NYC-WTC_000341540

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000341540Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280676

Memo proposing revised TH sampling plan in response to exposure changes and odors.

Similar indexed content

Compare copies and versions →