NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Additional work authorization, World Trade Center

Machine-extracted title · confidence 28%

Authorization document for World Trade Center trade; includes job name and address fields.

NYC-WTC_000341052
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

\ ADDITIONAL WORK AUTHORIZATION MAZZOCCHI WRECKING 32 WILLIAMS PARKWAY RO. BOX 331 ... un. EAST HANOVER. NJ 079364 ass1 PHONE; (973) 884-8682 FAX: (973) 377-7464 PHONE DATE name”5 Evergreen Recycling Of Corona (EROC) ///^/^ [718} 446-70QP JOB NAME JOB NUMBER Willets Point Boulevard World Trade Center CITY STREET Corona New York EXISTING CONTRACT NUMBER DATE OF EXISTING CONTRACT CITY STATE New York City New York You are authorized to perform the following specifically described additional work: Cat 246 Skid Steer /Ingersoll Rand Air Compressor Z^ /t/y/l Cat 980 Loader /Miller Maintenance Trailers z^ / Cat 966 Loader /a Welders Maintenance Trailers z_^ Cat 420 Loader Mechanics w/Service Trucks Z2_ / Hitachi 450 w/Grapple zs Clerical Personnel ///// Hitachi 550 w/Grapple Foreman Z^ Hitachi 550 w/Bucket S laborers/SfeiaijaTSr ZZ Hitachi 750 w/Grapple / Mechanics /Z Hitachi 330 w/Grapple Z Oilers / Hitachi 1200 w/Grapple S Operators Hitachi AH-400 Truck / Working Supervisors Z^. / Mobile Power Hasher Safety Supervisors ZZL Boll-Off Truck(s) /[//// Truck Drivers / Service Trucks 3 ., / Man Basket Tractor Trailer(s) 50 CY Tractor Trailer(s) low Bed ADDITIONAL CHARGE FOR ABOVE WORK IS: $ Payment will be made as follows:

Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. T P-GfYiO/fYq pDC Date Authorizing Signature ’xZ" C i_______ A o O 1 T' (OWNER SIGNS AeRE) ____________ bJ A ~~rH A f\j O-XA L We hereby agree to furnish labor and materials - complete in accordance with the above specifications, at above stated price.

Authurized Signature _ Date 7"

THIS IS CHANGE ORDE MOTE: This Revision becofr.es pan of and m conformance with the existing contract /

CITY_21MC100_000884347 NYC-WTC_000341052

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000341052Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279745

MWR authorization form for extra work on the Trade Center project.

Similar indexed content

NYC-WTC_000281700

Authorization indicating job name World Trade Center and related contract details.

Similar indexed content

Compare copies and versions →