Daily work force report, World Trade Center site, Jan 2002

Machine-extracted title · confidence 42%

Daily workforce and equipment details for World Trade Center; weather noted for January 15, 2002.

NYC-WTC_000341044
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 Bin Rosa. Willsalons. N.Y. 11357-(TIBI 767-9000 DATE; 1/15/02 NIGHT FINAL

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Canter Contract No. Weather Conditions: UNSEASONABLY MILD, YET BLUSTERY (3S mph WIND) & COLD. MOSTLY DARK.

Labor Equipment CLASSIFICATION QUANT. □ascription naaagBjRaaaCTHia [SUPERINTENDENT 2 CAT 968 LOADER 1 PROJECT ENGINEER ' 1 CAT 448 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 (FOREMEN 2 CAT 36S GRAPPLER 1 SAFETY OFFICER CAT37SGRAPPLER ~1 1 LABORERS 9 CAT 375 BUCKET IRON WORKERS HITACHI 7S0 GRAPPLER 1 LOCAL 14 5 HITACHI SSO GRAPPLER LOCAL 15 7 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 7 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 teamsters (FUEL)___________________ 1 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 3 TOOL VAN TEAMSTERS (STEEL AND DEBRIS; EUKES) . 14 ROLL OFF DUMP TRAILERS________ _ LOW BED TRAILER DELIVERIES; HIGH DEa< TRAILERS welding TRUCK_________ FUEL TRUCK_____________ 1 ■ PICKUP TRUCKS 3 ■ LIGHT TOWERS 5 ■ SITE MULE 3 [ DUMP TRUCKS ■ 10 WHEEL DUMP TRUCK ■ FLASHING ARROW BOARD 1 DELAYS: LOST 3.5 HOURS DUE TO FDNY ACTIVITY ■ OFFICE TRAILER/GENER. 1 IN THE HOLE. GRAPPLES DID NOT LOAD IN THE ■ CARGO BOXES 3 HOLE. ■ FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1

nesu Description of Work: COMPLETED WORK_______________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS _____________________________ MANNED WATERING STATIONS FOR DUST CONTROL__________________________________ MAINTAINED TRAFFIC INTO AND OUT OF AREA_______________________________________ APPROXIMATELY 3.5 HOUR DELAY DUE TO FDNY ACTIVITY RELATED TO FIRE IN THE HOLE. LOADS OUT; 83 EUKE5 OUT: 138

GRACE CONTRACTING CORP z Approved By: Tula: For: SUPERlNTENOeMT r -u

DAILY WORK FORCE REPOR70115N.xls

CITY_21MC1OO_OO4O2O7O7 NYC-WTC_000341044

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000341044Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →