Daily workforce report, Race Contracting, WTC site, Jan 2001

Machine-extracted title · confidence 42%

Workforce and equipment log for World Trade Center project day ledger.

NYC-WTC_000341032
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

WY-- ■ RACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: JANUARY 2, 2001 DAY (FINAL,

r DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 r CAT 966 LOADER i PROJECT ENGINEER CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 / CAT 365 GRAPPLER 1 SAFETY OFFICER 1 ' CAT 375 GRAPPLER 1 LABORERS 23 - CAT 375 GRAPPLER 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 BUCKET 1 LOCAL 15 10^ HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2’ 235 HAMMER HOE RAM 1 TEAMSTERS 1 - MECHANICS TRUCK 2 MECHANICS 2>' TOOL TRUCK HOUSE WRECKERS 7 ' TOOLVAN 1 ROLLOFF DUMP TRAILERS LOW BED TRAILER DELIVERIES; HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 4 FLAT TRUCK 1 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:_______,______________________________________________________________________ COMPLETED WORK____________________________________________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FOR DUST CONTROL ________________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA 2 MACHINES AT LEVELS B-5, 2 MACHINES AT LEVEL B-6: EL 242 CONTINUE ON B-6 IN MER ROOM & REMOVE ALL PIPING ON B-6 LOADS OUT: 89 YUKES OUT: 172

GRACE CONTRACTING CORP| ^lErweT^ BY;

SUPERINTENDENT

DAILY WORK FORCE REPORT 0102D.xls

CITY_21MC100_004020031

NYC-WTC_000341032

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000341032Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →