STATEN ISLAND LANDFILL: DEBRIS RECOVERY PROJECT
AIR QUALITY SAMPLING - MATERIALS AND METHODS
OB January, 2001 Control«1-53
Evans Environmentai & Geosciences
Introduction
The foliewing describes the maferiais and methods used by Evans Environmental &
Qeoscience.5 (EE&G) for air quality sampling on the Staten island Landfill Debris
Recovery Project. These methods have been employed since the onset of sampling in
October of 2001 and will continue to be employed until further notice. Future reports win
incorporate this Materials and Methods section by reference only in an effort to prevent
repetitive and unnecessary paperwork.
Asbestos
Air samples were collected by drawing a known volume of air across 25 mm mixed
cellulose eater filters using baJeiv powered pumps at approximate flow rates of 2.0 liters
per minute (ipm). The pumps were calibrated before and after use with a rotometer that
was in turn, calibrated against a primary standard. Sample pumps were secured to the
worker's waist, and the sample media was placed approximately i0 inches horn the
mouth of the worker. Samples were sent to EMSL Labcratory Inc., (EMSL) in
Pi.<?n:?teway. New Jersey for analysis by Phase Contrast Microscopy (PCM) following
method 7400 established by the National Institute of Occupationai Safety and Health
(NIOSH). Results were reported as fibers per cubic centimeter of air (f/cc).
Persona! exposure monitcring was conducted hy collection of whole-Shift samples
combined with 30 minute (approximate) excursion samples. The excursion samples
were taken during periods of fmo when the worker was involved in activities that would
have a high pofentiai for exposure to airborne contaminants. The whole-shift and
excursion samples were used to calculate time weighted averages which were then
adjusted to compare against the OSH A Permissible Exposure Limit (PEL) of 0.1 f/cc. In
some situations, NYPD personnel worked for leas than 48C minutes, in those situations,
the assumption was mads that the workers had no exposure to asbestos for the period
of time bekveen the actual work shift and the a-hour shift (480 minutes) used m
calci iSating the time weighted average.
A total of 109 whole-shift samples were collected during the period of time covered by
this report. In the event that the whole shift sample was overloaded, and could not be
analyzed, the exoureion samples were ii.sfiri to calculate the 8 hour time weighted
average. In these situations, the data was presented indicating that the exposure was
based on an assumption Likewise, in situations where it wa.s not feasible to collect an
excursion sample, the calculated time weighted average was based only on the whoie-
shitt sample.
Metals
Air samples were collected by drawing a known volume of air across a 37 miiiimctor
mixed cellulose ester filter, using battery powered pumps. The pumps vi/ere calibrated
CITY_21MC100_009262634
NYC-WTC_000340986
OCR can misread numbers and units. Confirm readings against the page image before using them.