NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 44 pages

OSHA Part 56 asbestos regulations text

Machine-extracted title · confidence 32%

New York DOSH Part 56 asbestos regulations and definitions.

NYC-WTC_000340368–000340411
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYSDOL - DOSH Regulations - Reg Page 26 of 44 asbestos dispersal to other areas of the building or structure.

(2) Local isolation. Local isolation and provision for temporary HVAC.

(3) Positive pressurization. Positive pressurization of the HVAC system.

(i) Positive pressurization shall be restricted to circumstances where HVAC must service the remainder of the building or structure and the HVAC equipment is in the work area or the ducts run through the work area. The appropriate HVAC duct and plenum outlets, inlets and exhaust dampers shall be sealed with sheathing and caulking, covered with a double layer of at least six-mil fire- retardant plastic sheeting and taped airtight. The HVAC duct and plenum joints shall be taped air­ tight. The mixing and balancing damper positions shall be altered and the return fan(s) shall be shut down to produce the required positive pressures. The supply fan(s) shall be placed in a manual "on" position to prevent shutdown by fail-safe mechanisms.

(ii) Project phasing, climate conditions, load conditions and HVAC equipment limitations and controls shall be considered when this alternate procedure is evaluated. Aerodynamics in the duct system, particularly spurs or trunks, shall be considered and, if necessary, the ducts/dampers shall be altered or removed to prevent loss of positive pressure in any part of the system. Precautions shall be taken during abatement activities to insure that the ducts, seals and static pressure lines are not damaged.

(iii) The presence of positive pressure shall be demonstrated on a daily basis by testing. Air sampling in occupied, downstream, nonwork areas shall be performed on a daily basis as per the requirements of section 56-17.3(a) of this Part. Positive pressure differential verification between the work area and nonwork areas shall be done on a continuous basis. The differential pressures shall be easily verifiable by use of leak-free, rigid, static pressure taps, static lines on the supply and return ducts, and static lines originating in the work area, adjacent areas, or downstream nonwork areas.

(f) HVAC filters and ducts.Contaminated HVAC filters shall be handled and disposed of as asbestos waste material. The ducts and filter assembly shall be wet-cleaned and/or HEP A- vacuumed where system air samples and/or dust samples indicate asbestos contamination.

(g) Movable objects.Movable objects within the work area shall be precleaned using HEPA-filtered vacuum equipment and/or wet cleaning, and such objects shall be removed from the work area to an uncontaminated location. Upholstered furniture and drapes shall be HEPA- vacuumed twice before removal from the work area. Carpeting shall be HEPA-vacuumed twice and cleaned before removal from the work area. If disposed of as asbestos waste material, cleaning is not required. If carpeting is left in place, it shall be covered with one-half- inch thick sheathing prior to required plasticizing.

(h) Fixed objects.Fixed objects, and other items which are to remain within the work area, shall be precleaned using HEPA-filtered vacuum equipment and/or wet cleaning. Such objects and items shall be enclosed with two layers of at least six-mil fire-retardant plastic sheeting and sealed with tape.

(i) Precleaning.The work area shall be cleaned using HEPA-filtered vacuum equipment and/or wet cleaning. Methods that raise dust, such as dry sweeping or vacuuming with equipment not equipped with HEPA filters, shall be prohibited. Asbestos material shall not be disturbed during precleaning.

Ci) Isolation barriers-general.Isolation barriers that seal off all openings, including but not limited to windows, corridors, doorways, skylights, ducts, grilles, diffusers and any other penetrations of the work area, shall be constructed using two layers of at least six-mil fire- retardant plastic sheeting sealed with tape. Also, all seams in system components that pass through the work area shall be sealed. Doorways and corridors which shall not http://www.labor.state.ny.us/html/safety/s56.htm 01/20/2001

CITy_21MC100_012156418

NYC-WTC_000340393

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340393Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →