NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Proposal for electrical work, QCME project, 2003

Machine-extracted title · confidence 25%

Proposal acceptance for electrical work on the QCME project, with quoted price and client contact.

NYC-WTC_000340143
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Jun 01 03 ll;4ap BOVIS LEND LEASE at QCME 212 447 1318 P-2

>

CO«»rn)uc^NC ELSCT3ICA*- CHBiNECaV

March 12.2003 Mite Pletscji aovls tend tease SZO First Avenue ■ New York. NY 10016 Yay (213) 447-1319

Re; OCM€ wre Recovery WorK C5T|S1691

DearPiesch

We are pleated to AiOrniC our pidposal In the amount of >S,40O (EIGHT THOUSAND FOUA HUNDRED OCLLARS) to perform eiecorfcal wtirk on the above-wehttoned project The propose cost Is based on an email recElved by mke Pietsch of Bovis C3-2-CB) and our 3-7-03 telephahe crwversatlorr. PtoWSal Price is CbseP on the following scope of work.

Scops of Wotki 1 Support It? existing down lights in Main Lobby 2 Support e existing down lights in Elevator Lobby 3 Support 15 existing 2x4 lights in new grid at stair Lobby 4 Support 1 existing 6'x18'x4" deep surfaca rrjouritetJ camera housing and camera in Main Lobby 5 S upport 2 existing 6"x13"x4" deep surface mounted camera housing and camera in ether Lobby Support I existing Exit fixture in Main Lobby jjt. J 7 Support 1 existing Exitfixture in other Lobby ,_ u-ru-k. a t >-80 Jiris'

qullflcaBonsi '***’’ ^0 tOCMS 1 Cerlllicate of Capital improvement, fumistwri to us (lax on labor noi included). a&rt mA, <McA-q 5 ■ 2 CerlfficatE of abatement and air quality lest must bo submitted prior to sBrting ths scope of work for the above memionori project. 3 All work to be performed in a hazardous free environment (Le. no ESbestos. no leBd). 4 No eccalabon.is inclutiEd and is based on currant labor agreement, which expires May '10.2004. 5 Oemtf is CEsumed ccmpiste. No Rernovals 6 Repair ar RaplBcementof damaged fixtures, Ians, and equipment not included. 7 No fbcuiiing Of sdjuatmenK- of carn’eras f&X & AR work performed after 5PM V-hourdays (ML OVERTIME TIME) 9 A minimum of 3 days are needed to comolete the scope of work. 10 Any coat for Ewilding and security not inriuded. 11 Ar.v cost far alBvatar Cl rvobi'sn rE,-nqral 'i£ rd Incivripri. ■ 12 Filing with the City of New .York Bureau of ElecdriqaI Control BEC-1 5A is included; any olhor rust ■ for filing or inspectiorr with any other agency is not torduded.

We Blank you for rhe opportunity tn. he of service to you. If you should have any qu£stions> ptsase de not hesitate to contact our office. Very truly yours, -rife- (Jote-. L-JOr-i E-J ftECtmCIfSTAUATION CO. u4O-t< Carlas D. Lalane EST#.1631 —FV-yol-S- Project Manager

CC: RicIsrC A. Poggl, John Scarpa, Angelo Economoo, David Wong (Bovis)

MIE ho -yoax J* WXww Jex -C* 'A'CUTeeiCEr-CrtM COHMCrrTiSUT

'venxtBtt BLVp.. VuBCvt rA»i T^t 7 1 B vi o--a 3^. 9. • co j ssi^ ,co«-.

- — .kAr„,v vaHcfrf GPM Wt f3-l2-<33).’xls ’ Page 7 of 4 3^2^2003

NYC-WTC_000340143 CITY_2IMCl0 0_0 018 0 3 4 51

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340143Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →